Macro
Jiangsu completely eliminates backward coal-fired power generating units
Seetao 2021-08-09 14:42
  • Jiangsu Province accelerates the increase in the proportion of non-fossil energy in primary energy consumption
Reading this article requires
7 Minute

The setting of the dual-carbon target has pushed the coal power industry, a major carbon emitter, to the forefront. The "Fourteenth Five-Year Plan for National Economic and Social Development of Jiangsu Province and the Outline of Long-Term Goals for 2035" issued recently pointed out:

Accelerate the green transition of energy, and comprehensively increase the proportion of non-fossil energy in primary energy consumption. Promote the centralized, large-scale development and sustainable development of offshore wind power in an orderly manner, accelerate the construction of onshore wind power parity projects, and build a national offshore wind power base of tens of millions of kilowatts. Promote the use of solar energy in accordance with local conditions, encourage the development of distributed photovoltaic power generation, promote the integrated development of distributed photovoltaic, energy storage, and microgrids, and build a batch of comprehensive utilization parity demonstration bases. We will diversify the utilization of biomass energy and advance the planning and construction of waste incineration power plants. Strengthen the coordination of source, network, load and storage, and improve the capacity of new energy consumption and storage. Safe use of nuclear energy and speed up the construction of Tianwan Nuclear Power Unit 7 and 8 project. Improve the level of clean and intensive use of coal, and completely eliminate outdated coal-fired power generation units. The adjustment of the energy structure will force the adjustment of the industrial structure, improve the advanced technology and manufacturing level of major energy equipment, and build a new energy industrial base.

Key energy infrastructure construction projects

Electricity and new energy: Baihetan-Jiangsu ±800kV UHV DC Project, Huaneng Nantong, Datang Nandian, Jiangyin Gas Turbine, Huadian Wangting Gas Turbine Innovation Demonstration Project, Nantong, Yancheng Offshore Wind Farm, Jurong, Lianyungang Pumped storage power station.

Oil and gas: Huadian Ganyu LNG receiving station, Rudong GCL Huidong LNG receiving station, Guoxin Rudong LNG receiving station, Binhai LNG receiving station expansion, Suzhou, Jiangyin, Zhenjiang and other riverside LNG receiving stations; Jiangsu section of the Sino-Russian East Line , Provincial coastal gas pipeline, Lianyungang-Yizheng crude oil pipeline, Lianyungang-Xuzhou refined oil pipeline; Suyanjing Shenzhangxing, Ganghua Jintan gas storage.

Keywords: infrastructure construction, infrastructure construction, domestic engineering news, infrastructure engineering news

Coal transfer, storage and transportation: the second phase project of the coal logistics base in Jingjiang Port District of Taizhou Port, the National Energy Group Changzhou Green Coal Reserve Logistics Base, the Lianyungang Modern Coal Supply Chain Service Demonstration Base, and the coal storage and distribution project in the Binhai Port District of Yancheng Port. Editor/Xu Shengpeng


Comment

Related articles

Macro

Solar manufacturing is booming in India

10-16

Macro

France 2023 solar PV installed capacity hit a new high

10-16

Macro

Mining goes overseas, Gabon starts gold mining development journey with China

08-19

Macro

Sign! China can build the first foreign aid project in Central Asia

07-19

Macro

Canada ushered in a number of energy storage projects

07-19

Macro

Egypt signs $33 billion green ammonia deal with energy giant

07-05

Collect
Comment
Share

Retrieve password

Get verification code
Sure