Recently, the Bo-gang railway, which was built with the participation of the China Railway Eighteenth Bureau Group, was officially put into operation. The smooth opening of the Bo-Hong Kong railway ended Binzhou Port’s history of non-rail transportation. The Bogang Railway is an extension of the first phase of the Bingang Railway project (Binzhan Line). It is connected to the Botou Town Station in Zhanhua District, to Binzhou Port in the north, passing through Zhanhua District, Wudi County, and Beihai Economic Development Zone, and a new main line is built The total length of the line is 65.32 kilometers. The first bid for the Bogang Railway, which is under the responsibility of the group company, has a total length of 28.43 kilometers, rebuilds 1.702 kilometers of existing lines, and builds two new stations. At the same time, the bid section passes through 4 townships and 32 administrative villages along the line.
Since entering the site, the project team has been deployed in advance, carefully organized, and managed scientifically, and has continuously overcome many difficulties such as long construction fronts, many external environmental disturbances, intricate underground water pipes along the local underground line, multi-disciplinary cross-working construction between the railway line and the line, and high construction technology requirements. , Completed various construction tasks with high quality and high efficiency, and ensured that the Bogang Railway was opened and operated on schedule.
Keywords: engineering construction, engineering news
After the Bogang Railway is opened and put into operation, the Binzhou-Hong Kong Railway will run through Binzhou and reach the port. At the same time, it will further play a role in the regional economic radiation of the railway channel, and will contribute to the realization of the “rail transfer” of bulk cargo transportation and promote the collection and distribution capacity of Binzhou Port. It is of great significance to promote and accelerate the development and construction of the northern region along the railway, and to stimulate the economic and social development of the region along the railway.Editor/Xing Wentao
Comment
Write something~