Construction
Super Large Diameter Shield Machine Ingenuity One Rolls Off the Line
Seetao 2021-10-14 10:17
  • After the project is opened to traffic, it will help promote the integrated development of the Yangtze River Delta region
Reading this article requires
2 Minute

On October 12, 2021, the 16-meter super large diameter shield machine "Craftsman No. 1" developed by the China Railway 14th Bureau Group passed the factory acceptance and rolled off the assembly line in Nansha, Guangzhou. It will soon be shipped to the Jiangyin Jingjiang Yangtze River Tunnel Project.

The "Craftsman No. 1" shield machine is 165 meters long and weighs about 4,300 tons. The "smiling angel" Yangtze finless porpoise painted with a cutter head is a national first-class protected animal. Its friendly and friendly smiling image highlights the regional cultural characteristics of Jiangsu. Contains high standards for ecological protection of the Yangtze River.

The smooth rolling off of the "Ingenuity One" shield machine marked the entry of the project into the shield construction stage. Next, the shield machine will officially start the journey across the Yangtze River. Editor/Sang Xiaomei

Comment

Related articles

Construction

The first phase of China Communications Ma Dong Railway has been fully opened

02-12

Construction

Crossing the Great Desert of the World! Chinese people are building railways in the Sahara

02-05

Construction

The largest wind power project in Central Asia leads Uzbekistan's energy transformation

01-19

Construction

Shanxi Quankupen anti-seepage pumped storage power station starts construction

01-19

Construction

Major projects in Yongji, Shanxi Province will start construction in 2026

01-13

Construction

Deep sea wind power project connected to the grid for power generation

01-12

Collect
Comment
Share

Retrieve password

Get verification code
Sure