A few days ago, the bidding results of the social investors of the concession project of Hekou-Maguan Expressway (Wenshan Prefecture Construction Section) were announced. Yunnan Construction Infrastructure Investment Co., Ltd. took the lead, Yunnan Construction Investment Holding Group Co., Ltd., Southwest Communications Construction Group Co., Ltd. , Yunnan Construction Investment Second Construction Co., Ltd. consortium won the bid for the project, with an estimated total investment of 5.4 billion yuan.
Project Overview
The Hekou-Maguan Expressway is located in the southeast of Yunnan Province, and the route direction is generally from west to northeast. The starting point of the line is located on the northwest side of Hekou County. The Basa Junction Interchange is set up to connect G8011 Kaiyuan to Hekou Expressway, passing Nanxi, Dananxi, Pingzi, Qiaotou Village, Donggualing, Baobaozhai, Hejiawan, Xinyao, Yu Bo and Damwei stop at the west side of Maguan County, and set up a Maguan interchange to connect the Wenshan-Maguan expressway.
Main control points: Hekou County, Nanxi, Dananxi, Qiaotou, Baobaozhai, Hejiawan, Xinyao, Yubo, Damwei.
Construction content, scale and standards
According to the "Hekou-Maguan Expressway Feasibility Study Report", the length of the Hekou-Maguan Expressway in Yunnan Province is 82.02 kilometers, of which: the length of the route within Hekou County is 40.8 kilometers, and the length of the route within Maguan County is 41.22 kilometers. According to the "Minutes of the Special Meeting on the Promotion of Luxi-Qubei-Guangnan-Funing Expressway and Hekou-Maguan Expressway Projects" by Wenshan Prefecture Transportation Bureau of Honghe Prefecture Transportation Bureau, the Hekou-Maguan Expressway Project can report two The state boundaries are: K0+000-K25+150 and K32+600-K48+245 are located in Honghe Prefecture (40.8 kilometers in total), K25+150-K32+600, K48+245-K82+011 are located in Wenshan Prefecture ( 41.22 kilometers in total). The proposed route K0+000-K25+150, K25+150-K32+600 and K32+600-K48+245 (48.245 kilometers in total) will be constructed, operated and maintained by Honghe Prefecture; K48+245-K82+011 The section (33.766 kilometers in total) is constructed, operated and maintained by Wenshan Prefecture. Therefore, only the section K48+245-K82+011 (33.766 kilometers in total) is considered in this tender. This project sets up Renhe connection line, which is planned to be 5.721 kilometers long and 10 meters wide in accordance with the secondary road standard.
The project is constructed according to the standard of two-way four-lane expressway, with a design speed of 80 km/h and a roadbed width of 25.5 meters. The design of bridges and culverts adopts the highway-I level as the vehicle load level, and other technical indicators are implemented in accordance with the "Highway Engineering Technical Standards" (JTG B01-2014). Keywords: engineering construction, engineering construction information
www.seetao.com Congratulations to the consortium of Yunnan Construction Infrastructure Investment Co., Ltd., Yunnan Construction Investment Holding Group Co., Ltd., Southwest Communications Construction Group Co., Ltd., and Yunnan Construction Investment Second Construction Co., Ltd. for placing orders! Editor/Sang Xiaomei
Comment
Write something~