Construction
Liaocheng Heilongjiang Road Tuhai River Bridge successfully closed
Seetao 2021-10-28 17:49
  • The completion of the bridge will improve the traffic pattern on both sides of the Tuhai River, greatly facilitating people's travel
Reading this article requires
2 Minute

On October 27, 2021, the arch ribs of the Tuhai River Bridge across Heilongjiang Road in Liaocheng were successfully closed, and the construction of the project was transferred from the upper steel structure stage to the bridge deck stage. The Tuhai River Bridge on Heilongjiang Road is designed to have a main span of 160 meters and a steel structure mid-through truss arch bridge with a total length of 252m and a bridge width of 46m. The successful closure of the bridge means that the main construction of the bridge is fully completed, and it is expected to be officially opened to traffic in June next year. Editor/Sang Xiaomei

Comment

Related articles

Construction

Shuangyashan Green Aviation Fuel Base officially launched

10-16

Construction

The autumn centralized construction of China's first heavy-duty Daqin Railway

10-08

Construction

The reconstruction project of the main trunk canal in Heihexi, Gansu Province was started

09-30

Construction

Jingzhou Libu Yangtze River Railway Bridge enters the main tower construction stage

09-29

Construction

Tuyi Technology Foshan Intelligent Manufacturing Base Project started

09-29

Construction

The Jingjiang River section waterway regulation project has started construction

09-27

Collect
Comment
Share

Retrieve password

Get verification code
Sure