Central enterprises
15.8 billion! Sichuan Nanchong-Chengdu Expressway won the bid
Seetao 2021-11-04 11:31
  • The construction of this project will greatly optimize the traffic layout in Sichuan
Reading this article requires
5 Minute

The Chengnan Expressway opened a new channel from Sichuan to the east. A few days ago, the expansion project of the Sichuan Nanchong-Chengdu Expressway was put on the agenda, and the winning bid has been announced. Each of the major central enterprises and local strong enterprises won bids. The winning bid amount exceeds 15.8 billion!

Project Overview

The main line of the Nanchong-Chengdu Expressway Expansion Project starts at Baihe Bridge, Dongguan Town, Gaoping District, Nanchong City, connects with Nandalian Expressway, and ends at the Interchange of Luojiba Hub of Chengdu Ring Expressway. The total length of the route is 215.697 kilometers.

The main line is equipped with 25,832.708m/148 bridges, including 5,723.34m/4 extra-large bridges, 15687.085m/61 bridges, 3,953.263m/63 middle bridges, and 469.02m/20 small bridges; 10,469m/9 tunnels, of which Extra-long tunnels are 3832.5m/1, long tunnels are 3315.5m/2, medium and short tunnels are 3321.0m/6; there are 835 new or modified passages and culverts; 24 interchanges (including 8 hubs) are set up, Among them, 15 intercommunication sites were renovated and expanded in situ, 6 intercommunication sites were newly added, and 3 intercommunication sites were relocated and newly built; 45 separated vehicle overpasses and 55 overpasses were set up. Keywords: engineering construction, engineering construction, engineering construction information

Winning bid result

The LJ4 tender was led by Sichuan Highway and Bridge Construction Group Co., Ltd.) and Sichuan Communications Construction Group Co., Ltd., which won the tender with 4,243,992,461 yuan; the LJ5 tender was awarded by China Communications Third Navigation Engineering Bureau Co., Ltd. Won the bid section; the LJ6 bid section was won by China State Construction Co., Ltd. at 3126284935 yuan; the LJ7 bid section was won by Dezhou Highway Engineering Corporation at 2063678288 yuan; the LJ8 bid section was won by China Railway 20 Bureau Group Co., Ltd. won the tender for 2133056159 yuan; the LJ9 tender was won by Xiamen Engineering Co., Ltd. of China Communications First Public Works Co., Ltd. for 2015942098 yuan. Editor/Sang Xiaomei

Comment

Related articles

Central enterprises

The 12th Hydropower Bureau and the Zhejiang Emergency Department build a rescue alliance

08-19

Central enterprises

XCMG Group and Rio Tinto Group sign a global cooperation framework agreement

08-15

Central enterprises

China Power Construction and State power Investment leaders to deepen energy cooperation

07-20

Central enterprises

China Construction Third Engineering Bureau Zhejiang Transportation Project

07-18

Central enterprises

5.635 billion yuan! China Energy Construction won the bid for Jinneng Phase III project

07-15

Central enterprises

National Railway Administration and Chongqing City Sign Cooperation Agreement

07-04

Collect
Comment
Share

Retrieve password

Get verification code
Sure