The construction of water conservancy projects and water safety projects are one of the fundamental guarantees of people's lives. Recently, the Sichuan Provincial People's Government officially released the Sichuan Province’s "14th Five-Year Plan" water safety guarantee plan.
The "Plan" is a key special plan determined by the Sichuan Provincial Government. On the basis of summarizing the achievements of Sichuan water conservancy development during the "13th Five-Year Plan" period, based on the new development stage, implement the new development concept, integrate into the new development pattern, and take the promotion of high-quality development as the theme. To study and put forward the overall requirements, key tasks, safeguard measures and long-term goals of water security during the "14th Five-Year Plan" period. This is the guiding document for Sichuan Province's water security work in the next five years and beyond.
The "Planning" proposes that by 2025, Sichuan's water conservancy industry will achieve great development, breakthroughs in water safety guarantee capabilities, and effective protection of water demand for economic and social development and ecological civilization construction. In terms of the intensive use of water resources, by 2025, the total water consumption in Sichuan will be controlled within 33 billion cubic meters, and the water consumption for 10,000 yuan of GDP and 10,000 yuan of industrial added value will decrease compared with 2020. The national goal and task have been completed, and the effective utilization coefficient of irrigation water will be increased to over 0.5.
In 2025, Sichuan's water conservancy industry will achieve great development, and breakthroughs will be achieved in the ability to guarantee water safety, which will effectively guarantee the water demand for economic and social development and the construction of ecological civilization. Important progress has been made in the integration of water resources intensive water supply and rural water supply services. The security of urban and rural water supply and the ability to fight drought and emergency response have been significantly enhanced, and the extent of large-scale water supply coverage has been significantly improved. The newly increased living, production, and ecological water supply capacity will be 2 billion cubic meters, and the rural tap water penetration rate will reach 88%.
The "Plan" specifically deploys the construction of a complete water network system: strengthen the interconnection between the project water network and the natural water network, and do a good job in the rational allocation of natural water resources and the project allocation of water resources. Adhere to the principle of water resources allocation of “priority near water, replenishment from the north, transfer from the west to the east, and mutual assistance from multiple sources”, coordinate river basins and regions, and build two large-scale projects with large-scale public water transfer and water transfer from the Yangtze River as the backbone. "Five horizontal and six vertical" as the framework, large, medium, small and micro supporting facilities, comprehensive connection of provincial, municipal, county, and rural water networks, forming a collection, storage, introduction, supply, drainage, and protection of industrial and agricultural production water for food security And provide a solid guarantee for economic and social development. Keywords: infrastructure, infrastructure construction, domestic engineering news, new infrastructure news, new infrastructure engineering, infrastructure engineering news
The "Plan" clearly pointed out that during the "14th Five-Year Plan" period, Sichuan Province will vigorously promote the Dajimin and Long March Canal water transfer projects. Editor/Xu Shengpeng
Comment
Write something~