Central enterprises
CSCEC organized a bid for Guangzhou's 18.4 billion intercity railway!
Seetao 2021-11-19 17:34
  • The completion of the project will support the construction of the international aviation hub of Guangzhou Baiyun International Airport
  • The completion of the project will realize the 30-minute connection between Baiyun Airport and Guangzhou’s old city center, and at the same time realize the convenient connection between the three terminals
Reading this article requires
6 Minute

On November 19, 2021, Guangzhou Public Resources Exchange announced the announcement of candidates for the Intercity Project from Fangcun to Baiyun Airport. The tenderee, Guangzhou Metro Group Co., Ltd., and the luxurious lineup of China Construction Group, successfully bid for the 18.4 billion Guangzhou Intercity Railway!

Project Overview

The construction site is located in Guangzhou City. The length of the line is about 41.1 kilometers, and the details are subject to approval. Fangcun-Baiyun Airport Intercity Project (Fangbai Intercity), the line starts at Fangcun Station (excluding) and ends at Airport North Station. The line is about 41.1 kilometers long and is laid underground. 10 newly built stations are: Rainbow Bridge Station, Guangzhou Railway Station, Baiyun Station, Xia Mao Station, Baiyun City Center Station, Fangshi Station, Renhe Station, Airport East Station, Airport South Station, Airport North Station. The line uses 8 marshalled city-domain D-type vehicles, operating on fast and slow lines, with a design speed of 160 kilometers per hour, and cross-line operation with Guangzhou east to Huadu Tiangui. There is one depot on the whole line, which is shared with the Guangzhou East-to-Huadu Tiangui Intercity Project, and there are 2 main transformers, which are shared with the Guangzhou East-to-Huadu Tiangui Intercity Project, and the whole line is connected to the existing Longzhen Control Center.

The planned cooperation period and construction period The cooperation period of Part A and Part B consists of a construction period and an operation period. Among them, the construction period is 6 years, and the operation period is 10 years. The specific duration of the simultaneous implementation of the project shall be subject to the notification of the tenderer.

Winning bid result

See Dao Wang He China Construction Co., Ltd., Guangzhou Green No. 1 Infrastructure Equity Investment Partnership, China Construction Second Engineering Bureau Co., Ltd., China Construction Third Bureau Group Co., Ltd., China Construction Fourth Engineering Bureau Co., Ltd., China Construction Installation Group Co., Ltd., Guangdong Construction Engineering Group Co., Ltd., China Construction Infrastructure Co., Ltd., China Construction South China Construction Investment Co., Ltd., China Construction First Bureau (Group) Co., Ltd., China Construction Eighth Engineering Bureau Co., Ltd., Guangdong China Tunnel Construction Group Co., Ltd. Consortium is pleased to raise tens of billions of orders! Editor/Sang Xiaomei

Comment

Related articles

Central enterprises

The 12th Hydropower Bureau and the Zhejiang Emergency Department build a rescue alliance

08-19

Central enterprises

XCMG Group and Rio Tinto Group sign a global cooperation framework agreement

08-15

Central enterprises

China Power Construction and State power Investment leaders to deepen energy cooperation

07-20

Central enterprises

China Construction Third Engineering Bureau Zhejiang Transportation Project

07-18

Central enterprises

5.635 billion yuan! China Energy Construction won the bid for Jinneng Phase III project

07-15

Central enterprises

National Railway Administration and Chongqing City Sign Cooperation Agreement

07-04

Collect
Comment
Share

Retrieve password

Get verification code
Sure