Construction
First-line perspective | Seafarers are strengthening stable supply
Seetao 2021-11-25 15:15
  • The crew of CNOOC promptly discharged the open-air fresh water and fire-fighting pipelines to prevent the residual water from freezing
Reading this article requires
1 Minute

On November 21, a new round of cold air came in the seas of Liaodong, and the temperature dropped to minus 10 degrees Celsius. The crew of the "Offshore Oil 649" ship intensively carried out winter defense work to ensure the normal operation of the ship at low temperatures.Editor/Baohongying

Comment

Related articles

Construction

Shuangyashan Green Aviation Fuel Base officially launched

10-16

Construction

The autumn centralized construction of China's first heavy-duty Daqin Railway

10-08

Construction

The reconstruction project of the main trunk canal in Heihexi, Gansu Province was started

09-30

Construction

Jingzhou Libu Yangtze River Railway Bridge enters the main tower construction stage

09-29

Construction

Tuyi Technology Foshan Intelligent Manufacturing Base Project started

09-29

Construction

The Jingjiang River section waterway regulation project has started construction

09-27

Collect
Comment
Share

Retrieve password

Get verification code
Sure