Central enterprises
Changsha Metro Line 7 wins the bid and puts it on the list!
Seetao 2021-12-06 16:56
  • Changsha Metro Line 7 is an important public transportation that facilitates citizens' travel
Reading this article requires
5 Minute

On December 6, 2021, the Hunan Provincial Tendering and Bidding Supervision Network announced that the first phase of Changsha Rail Transit Line 7 (Yuntang Station-Wulipai Station) civil construction project won the public bidding announcement. The total length of the line is 16.836 kilometers. It won 2 bids totaling 6.1 billion, and China Construction received 3 billion.

Project Overview

The first phase of Changsha Rail Transit Line 7 (Yuntang Station-Wulipai Station) is located in the Hedong area of Changsha City. The line starts at Yuntang Station and ends at Wulipai Station. The total length of the line is 16.836 kilometers and there are 16 stations. Among them, there are 9 transfer stations with an average distance of 1.106 kilometers. The line is mainly laid along Shaoshan Road and Bayi Road, connecting the main commercial districts such as Hongxing Commercial District, Dongtang Commercial District and Yuanjialing Commercial District, covering the passenger flow corridor of Shaoshan Road, connecting with transportation hubs such as South Bus Station and Changsha Railway Station. An encrypted supplementary line in the urban area. Section 1 is from Yuntang Station (inclusive) to Wanfunan Station (inclusive), car depot (including entry and exit lines), 3 stations and 3 sections. Section 2 is from Wanfunan Station (not included) to Yuhuating Station (not included), with 6 stations and 7 sections. Section 3 is from Yuhuating Station (inclusive) to Wulipai Station (inclusive), with 7 stations and 6 sections.

Successful bid information

1 The bidding section was led by China State Construction Engineering Corporation. The consortium of China Construction Sixth Engineering Bureau Co., Ltd. and China Construction Fifth Engineering Bureau Co., Ltd. won the bid with 3 billion. Section 2 and Section 3 are led by China Railway Construction Co., Ltd., China Railway 11th Bureau Group Co., Ltd., China Railway 12th Bureau Group Co., Ltd., China Railway 14th Bureau Group Co., Ltd., and China Railway 18th Bureau Group Co., Ltd. Won the bid with 3.065 billion and 3.1 billion. Editor/Sang Xiaomei

Comment

Related articles

Central enterprises

The 12th Hydropower Bureau and the Zhejiang Emergency Department build a rescue alliance

08-19

Central enterprises

XCMG Group and Rio Tinto Group sign a global cooperation framework agreement

08-15

Central enterprises

China Power Construction and State power Investment leaders to deepen energy cooperation

07-20

Central enterprises

China Construction Third Engineering Bureau Zhejiang Transportation Project

07-18

Central enterprises

5.635 billion yuan! China Energy Construction won the bid for Jinneng Phase III project

07-15

Central enterprises

National Railway Administration and Chongqing City Sign Cooperation Agreement

07-04

Collect
Comment
Share

Retrieve password

Get verification code
Sure