Central enterprises
15.4 billion! Announcement of the bid for the big order of Hubei Expressway!
Seetao 2021-12-24 10:48
  • The project is to continuously strengthen the strategic support for the development of the Hanjiang Eco-economic Belt
Reading this article requires
8 Minute

On December 23, 2021, the Hubei Provincial Public Resources Trading Center announced that Hubei Provincial Communications Investment Group Co., Ltd. participated in the selection of WTWHTJ-1 bids, WTWHTJ-2 bids, WTWHTJ-3 bid section evaluation results announced that China Railway Construction, China Communications Construction, and China Construction are expected to win the large order of Hubei Expressway. The estimated total investment amount is about 15.42 billion yuan, and the total construction and installation cost is about 10.83 billion yuan.

Project Overview

The construction site is located in Wuhan City and Hanchuan City, Hubei Province. The Wuhan-Hanchuan section of Wuhan-Tianmen Expressway starts at the north side of Yangxin Village, Yuxian Street, Caidian District, Wuhan City, crosses Songyang Avenue and crosses Suozi Changhe Provincial Wetland Park , To the intersection of Suohe and Han-Cai Expressway, passing through Songyang Forest Park, entering Hanchuan, and setting up a Hanjiang Bridge in Ma'an Township to cross the experimental area of the Hanjiang National Aquatic Germplasm Resources Protection Zone, to the intersection of Chenghuang and Wuhan Metropolitan Area. Via Huayan, Fenshui, Litan to Tianerhebei (South of Zhongzhou), crossing with Wuhan City Circle Ring Expressway, connecting Wuhan-Tianmen Expressway City Circle Ring Expressway to Suiyue Expressway, the total length of the route is about 53.580 kilometers, of which The mileage in Wuhan City (K23+366~K33+124) is about 9.758 kilometers, and the mileage in Hanchuan City (K33+124~K76+946) is about 43.822 kilometers. The design speed of 120km/h and roadbed width of 34.0m are planned to be adopted for the whole line. Six-lane highway standard. It is planned to build 46.87km/12 extra-large bridges, and a total of 1.7km/4 large and medium bridges. The project will have 9 interchanges, 1 main line toll station, 5 ramp toll stations, 1 service area, management and monitoring There is 1 sub-center, 1 maintenance work area, 1 road administration brigade barracks, 1 traffic police barracks, and 1 over-limit inspection station.

Scope of bidding

The scope of this tender is part of the cooperative units of the members of the bidding consortium that the project investors bid for. After winning the bid, the bidder shall sign a cooperation agreement with the tenderer and other consortium member units determined by the tenderer, and sign a consortium agreement in accordance with the format specified in the investor’s bidding documents to jointly form a consortium for Wuhan-Tianmen Expressway from Wuhan to Han Investors in the Sichuan section invite tenders for bidding. The winning bidder (as Party B) signs a contract with the project company (as Party A) and undertakes the design or construction of the corresponding projects within the scope of the project listed in the contract content column in Appendix 1 of the Bidding Announcement of this Bidding Document. Keywords: engineering construction, engineering construction, engineering construction information

Bid division

Successful bid information

China Railway 20th Bureau Group Co., Ltd. won the bid for WTWHTJ-1 bid section, China Communications Road and Bridge Construction Co., Ltd. won the bid for WTWHTJ-2 bid section, and China Construction Fifth Engineering Bureau Co., Ltd. won the bid for WTWHTJ-3 bid section. Editor/Sang Xiaomei

Comment

Related articles

Central enterprises

The 12th Hydropower Bureau and the Zhejiang Emergency Department build a rescue alliance

08-19

Central enterprises

XCMG Group and Rio Tinto Group sign a global cooperation framework agreement

08-15

Central enterprises

China Power Construction and State power Investment leaders to deepen energy cooperation

07-20

Central enterprises

China Construction Third Engineering Bureau Zhejiang Transportation Project

07-18

Central enterprises

5.635 billion yuan! China Energy Construction won the bid for Jinneng Phase III project

07-15

Central enterprises

National Railway Administration and Chongqing City Sign Cooperation Agreement

07-04

Collect
Comment
Share

Retrieve password

Get verification code
Sure