Transportation
The new Nanchang via Jingdezhen to Huangshan railway will be tendered!
Seetao 2022-01-24 14:24
  • The completion of the project will further improve the road network layout of Anhui and Jiangxi provinces
  • The completion of the project will promote the prosperity and development of the Poyang Lake Ecological Economic Zone, assist the development of the Yangtze River Economic Belt, and accelerate the rise of central Jiangxi
Reading this article requires
14 Minute

On January 21, 2022, the Beijing Construction Engineering Information Network announced that the construction of 6 station buildings and related projects including the Nanchang via Jingdezhen to Huangshan Railway (Jiangxi section) Yaoli Station and other related projects will be contracted, the industry housing construction, the tenderer China Railway Design Group Co., Ltd. The planned construction period is 676 calendar days, the planned start date is February 22, 2022, and the planned completion date is December 30, 2023.


Project Overview

The construction site is Jiangxi Province. The newly built Nanchang-Jingdezhen-Huangshan Railway is located in northeastern Jiangxi and southern Anhui. It starts from Nanchang City, Jiangxi Province in the west, passes through Shangrao City and Jingdezhen City in Jiangxi Province, and reaches Huangshan City in Anhui Province in the east. The total length of the main line is 289.807km, of which 200.276km in Jiangxi Province and 89.531km in Anhui Province. The contact line is 29.383km long, and the moving line is 9.57km long. The bridge-to-tunnel ratio of the main line is 87.31%. There are 10 stations in Huangshan North, Yixian East, Qimen South, Yaoli, Jingdezhen North, Huanggang Station, Poyang South, Yugan, Junshan Lake and Nanchang East.

Tender division

This tender is divided into 3 tenders, tender numbers: CJHFJJX-2, CJHFJJX-3, CJHFJJX-4.

CJHFJJX-2

The number of projects is: Main project content: 1) Station buildings, production and living buildings and ancillary projects: mainly include building structure engineering, decoration engineering (including platform surface, passenger tunnel decoration and lighting, static signs; including Yugan Station entry and exit passages) , water supply and drainage and fire protection engineering, ventilation and air conditioning engineering, building electrical engineering (including comprehensive grounding within 20 meters), FAS and BAS systems, electric (escalator) and power distribution, pre-embedded and blocked pipelines through walls, Ancillary supporting projects, etc. 2) Parking lot works: mainly include construction and installation works and related supporting works. 3) Relevant supporting projects: mainly include water supply and drainage, yard, canopy, electric (escalator) ladder, station building and accessories. For the specific project content, please refer to the technical part of the bidding documents and the list of works. Mileage/scope: Yugan Station, Junshan Lake Station, station building and production and living houses, Nanchang East Storage Park, Nanchang East Comprehensive Maintenance Work Area, and interval DK200+353.33 to DK310 +700.0 production and living houses (including interval guard booths, police districts, etc.), related supporting projects.

CJHFJJX-3

The number of projects is: Main project content: 1) Station buildings, production and living buildings and ancillary projects: mainly include building structure projects, decoration projects (including platform, passenger tunnel decoration and lighting, static signs; including Poyang South Station entry and exit passages) , water supply and drainage and fire protection engineering, ventilation and air conditioning engineering, building electrical engineering (including comprehensive grounding within 20 meters), FAS and BAS systems, electric (escalator) and power distribution, pre-embedded and blocked pipelines through walls, Ancillary supporting projects, etc. 2) Parking lot works: mainly include construction and installation works and related supporting works. 3) Relevant supporting projects: mainly include water supply and drainage, yard, canopy, electric (escalator) ladder, station building and accessories. For the specific project content, please refer to the technical part of the bidding documents and the list of works. Mileage/scope: Leping North Station, Poyang South Station station building and production and living houses, Poyang South comprehensive maintenance work area, production and living houses in the interval DK164+565.08 to DK200+353.33 (including interval guard booths, police districts, etc.), and related supporting projects.

CJHFJJX-4

The number of projects is: Main project content: 1) Station buildings, production and living buildings and ancillary projects: mainly include building structure engineering, decoration engineering (including platform, passenger tunnel decoration and lighting, static signs), water supply and drainage and fire protection engineering, ventilation It is related to air-conditioning engineering, building electrical engineering (including comprehensive grounding and lead connection within 20 meters), FAS and BAS systems, electric (escalator) and power distribution, pre-embedded and blocked pipelines through walls, and ancillary supporting projects. 2) Parking lot works: mainly include construction and installation works and related supporting works. 3) Relevant supporting projects: mainly include water supply and drainage, yard, overpass, canopy, electric (escalator) ladder, station building and accessories. For the specific project content, please refer to the technical part of the bidding documents and the list of works. Mileage/scope: Yaoli Station, Jingdezhen North Station station building and production and living houses, Jingdezhen North Station parking yard, Yaoli comprehensive maintenance work area, Jingdezhen North comprehensive maintenance work area, Production and living houses in the interval DK89+517 to DK164+565.08 (including the interval post box, police area, etc.), related supporting projects.

Obtaining tender documents

Bidders are requested to log in to the Beijing Engineering Construction Public Resources Trading Platform to download the electronic bidding documents from 17:00 on January 21, 2022 to 17:00 on January 26, 2022 (Beijing time, the same below). The deadline for submitting documents is 10:30 on February 16, 2022, and the location for submitting bid documents is in the bid opening area of Beijing Construction Engineering Contracting and Trading Center (Address: No. 15, Beidaotian Nanli, Xiying Road, Changyang Town, Fangshan District, Beijing, near Changyang Light Rail near the station). Editor/Sang Xiaomei

Comment

Related articles

Transportation

Road Construction holds 2024 New Quality Development Technology Seminar

11-26

Transportation

Shanghai Zhoudeng Expressway officially starts construction

10-15

Transportation

The terminal building of Dalian New Airport has started construction!

10-14

Transportation

70 billion yuan intercity railway project is coming!

10-14

Transportation

Seymour is about to build a road

10-12

Transportation

The Kazakhstan Mongolia highway connection is about to be launched

10-12

Collect
Comment
Share

Retrieve password

Get verification code
Sure