Central enterprises
15.4 billion! Hubei Expressway won the bid announcement
Seetao 2022-01-27 15:10
  • The completion of the project will improve the traffic capacity of Wuhan's westward urban development axis
Reading this article requires
6 Minute

On January 27, 2022, the Hubei Provincial Public Resources Trading Center released the results of the bid evaluation of the investor WTTZ-1 of the Wuhan-Hanchuan section of the Wuhan-Tianmen Expressway. The consortium led by Wuhan Eco-Environmental Investment and Development Group won the bid one! The estimated total investment of the project is about 15.42 billion yuan.

Project Overview

Construction site Wuhan City, Hanchuan City, Hubei Province. The Wuhan-Hanchuan section of the Wuhan-Tianmen Expressway starts from the north side of Yangxin Village, Yuxian Street, Caidian District, Wuhan City, crosses Songyang Avenue, and crosses the Suozi Changhe Provincial Wetland Park. Zhisuo River crosses with Hancai Expressway, passes through Songyang Forest Park, and enters Hanchuan border. In Ma'an Township, a Hanjiang River Bridge is set up to cross the Hanjiang National Aquatic Germplasm Resource Reserve Experimental Zone, and Zhichenghuang intersects with the Wuhan metropolitan area ring line. Huayan, Fenshui, Litan to Tianerhebei (South of Zhongzhou), intersect with Wuhan City Circle Ring Expressway, and connect Wuhan to Tianmen Expressway City Circle Ring Road to Suiyue Expressway. The total length of the route is about 53.580 kilometers, of which Wuhan The mileage in the city (K23+366~K33+124) is about 9.758 kilometers, and the mileage in Hanchuan City (K33+124~K76+946) is about 43.822 kilometers. The whole line is planned to adopt the two-way six-lane expressway standard with a design speed of 120km/h and a subgrade width of 34.0m. It is planned to build 46.87km/12 extra-large bridges, 1.7km/4 large and medium bridges, 9 interchangeable interchanges, 1 main line toll station, 5 ramp toll stations, 1 service area, management and monitoring There are 1 sub-center, 1 maintenance work area, 1 road administration brigade barracks, 1 traffic police barracks, and 1 overrun detection station. The estimated total investment amount is about 15.42 billion yuan, and the total construction and installation cost is about 10.83 billion yuan.

Bidding result

The first candidate is led by Wuhan Eco-Environmental Investment and Development Group Co., Ltd., which is composed of Wuhan Municipal Road and Bridge Co., Ltd., China Gezhouba Group Co., Ltd., China Gezhouba Group Three Gorges Construction Engineering Co., Ltd., and CCCC Second Highway Survey and Design Research Institute Co., Ltd. the union. Editor/Sang Xiaomei

Comment

Related articles

Central enterprises

The 12th Hydropower Bureau and the Zhejiang Emergency Department build a rescue alliance

08-19

Central enterprises

XCMG Group and Rio Tinto Group sign a global cooperation framework agreement

08-15

Central enterprises

China Power Construction and State power Investment leaders to deepen energy cooperation

07-20

Central enterprises

China Construction Third Engineering Bureau Zhejiang Transportation Project

07-18

Central enterprises

5.635 billion yuan! China Energy Construction won the bid for Jinneng Phase III project

07-15

Central enterprises

National Railway Administration and Chongqing City Sign Cooperation Agreement

07-04

Collect
Comment
Share

Retrieve password

Get verification code
Sure