Municipal
12 projects in Shandong port started
Seetao 2022-03-08 10:51
  • This is another important measure for Shandong Port to implement the conversion of old and new kinetic energy
Reading this article requires
10 Minute

Recently, Shandong Port Port Industry City Integration Development (Rizhao) completed project and new project commencement ceremony was held simultaneously in the main venue and 2 branch venues of Shandong Port Rizhao Port Shijiu Port Area. 7 projects with a total investment of 9.2 billion yuan were completed and put into production. The construction of 12 new port-industry-city integration projects with a total investment of 18.1 billion yuan has started, opening a new chapter in the joint development of Shandong Port and Rizhao Port City in 2022.

A total of 19 projects have been completed and put into production and planned new projects, with a total investment of 27.3 billion yuan. Among them, 7 projects have been completed and put into production, including the third phase of the oil depot and the #12 and #16 berth projects in the southern operating area of Lanshan Port, with a total investment of 9.2 billion yuan.

The total investment of the 12 Hong Kong-industry-city integration projects started this time will reach 18.1 billion yuan. It includes not only 10 port projects such as Lannan 17#18#20#22# berth and Lannan railway project that Rizhao Port plans to start construction, but also 2 Shandong Port Cold Chain Industrial Park invested and constructed by Shandong Port Industry-City Integration Group The project covers a wide range and has a strong focus, which reflects the new strategic plan of Shandong Port, which relies on the urban planning, industrial development and policy support opportunities of Rizhao City, gives full play to the advantages of Shandong Port’s integrated operation and full chain extension, and jointly creates a new strategic plan for the deep integration of port industry and city.

The construction of 10 port projects will effectively enhance the comprehensive service capability of Rizhao Port. Among them, the smart green bulk cargo operation area project in the southern area of Shijiu port area was completed to realize the processization, automation and intelligence of bulk cargo operations; the third phase of the 300,000-ton crude oil terminal project in Lanshan port area was completed, focusing on building the only coastal port in China The port area has four 300,000-ton crude oil terminals; the reconstruction and expansion project of the Lannan bulk grain storage and transportation system is completed, which echoes the north-south grain system of the Shijiu port area, and helps the efficient development of the port-facing industries such as the deep processing of the grain industry in Rizhao City; Lanshan is completed. The second phase of the deep-water channel project in the port area will enhance the ability of large ships to enter and leave the port, strengthen the bridgehead for the southward development of Shandong ports, enable the opening and living of the city, and help to build a land-sea linkage conversion hub in the Yellow River Basin, a northern energy hub, and a port-based national logistics hub.

Taking this completed project into production and the start of new projects as an opportunity, Rizhao City will continue to deepen the strategic cooperation with Shandong Port, support the reform and development of Rizhao Port, provide service guarantees in project approval, resource elements, etc., and continuously expand the breadth and scope of cooperation. We will make every effort to create a new situation for the integrated development of Hong Kong, industry and city. In the future, Shandong Port will fully participate in and integrate into the economic and social development of Rizhao, extend the upstream and downstream industrial chain of the port, and accelerate the formation of a unique port industry cluster; it will deeply integrate into the new development pattern, accelerate the transformation and upgrading of Rizhao Port and other projects, and continue to improve The collection and distribution system continuously improves the port's energy level; adheres to the concept of green ecological development, focuses on the dual-carbon goal of cohesion, and promotes the iterative upgrade of the construction of smart ports, striving to write a new chapter in the wonderful transformation of a modern coastal city, and make Shandong Port a new and bigger port contribute. Editor/He Yuting

Comment

Related articles

Municipal

G228 Dandong Line Nangu Section Repair and Maintenance Project Commences

10-16

Municipal

EPCC General Contract for 300000 Tons Propane Dehydrogenation to Polypropylene Project

09-25

Municipal

Pakistan's white oil pipeline construction is about to start

09-20

Municipal

Kazakhstan's manufacturing industry surpasses mining industry for the first time

09-12

Municipal

Nanchang AMEC GaAs-based LED MOCVD equipment project was signed

09-11

Municipal

From northern Shaanxi to Guanzhong, the 750 kV channel started

09-02

Collect
Comment
Share

Retrieve password

Get verification code
Sure