New Energy
7 hydropower projects included in Sichuan's 14th Five-Year Energy Plan
Seetao 2022-03-14 17:21
  • Efforts should be made to optimize the hydropower structure and give full play to the comprehensive role of hydropower stations
Reading this article requires
3 Minute

Recently, the Sichuan Provincial People's Government issued the "14th Five-Year Plan for Energy Development of Sichuan Province". Seven hydropower projects, including Eagle Rock Grade II, were included in the plan.

It is pointed out in the plan that, on the premise of strengthening ecological environment protection and doing a good job in resettlement of immigrants, focus on promoting the construction of the "Three Rivers" hydropower base, focusing on optimizing the hydropower structure, and giving full play to the comprehensive role of hydropower stations in flood control, water storage and supply, and water ecological protection. Deepen the pilot project of comprehensive hydropower management in the Dadu River Basin, complete and put into operation Shuangjiangkou, Jinchuan and other power stations, accelerate the construction of Pillowba II and Shaping I power stations, and approve the construction of Danba, Anning, Badi, Eagleyan I and Laoyingyan II level power station. Editor / Xu Shengpeng


Comment

Related articles

New Energy

The green power supply project of Xilingol Industrial Park has started construction

10-17

Wind power

China Construction Bureau won the bid for 200MW wind power project in Inner Mongolia

10-17

Photovoltaic

Longyuan Power 150MW photovoltaic project was filed

10-17

Battery

Xinjiang Yuha zero-carbon technology industry solid-state battery project started

10-16

Wind power

A 100MW wind power project started in Jingtai County, Gansu Province

10-16

Hydrogen energy

Petrobras is building the first hydrogen plant to use solar energy

10-15

Collect
Comment
Share

Retrieve password

Get verification code
Sure