New Energy
7 hydropower projects included in Sichuan's 14th Five-Year Energy Plan
Seetao 2022-03-14 17:21
  • Efforts should be made to optimize the hydropower structure and give full play to the comprehensive role of hydropower stations
Reading this article requires
3 Minute

Recently, the Sichuan Provincial People's Government issued the "14th Five-Year Plan for Energy Development of Sichuan Province". Seven hydropower projects, including Eagle Rock Grade II, were included in the plan.

It is pointed out in the plan that, on the premise of strengthening ecological environment protection and doing a good job in resettlement of immigrants, focus on promoting the construction of the "Three Rivers" hydropower base, focusing on optimizing the hydropower structure, and giving full play to the comprehensive role of hydropower stations in flood control, water storage and supply, and water ecological protection. Deepen the pilot project of comprehensive hydropower management in the Dadu River Basin, complete and put into operation Shuangjiangkou, Jinchuan and other power stations, accelerate the construction of Pillowba II and Shaping I power stations, and approve the construction of Danba, Anning, Badi, Eagleyan I and Laoyingyan II level power station. Editor / Xu Shengpeng


Comment

Related articles

New Energy

Sany Heavy Energy and Kazakhstan Fund jointly build a $114 million wind power plant

12-04

Wind power

China Huadian joins hands with ERG to build a $160 million wind power plant in Kazakhstan

12-03

Energy storage

Successful testing of maximum capacity grid type energy storage

11-26

Hydrogen energy

National Energy Group builds a green hydrogen energy industry system

11-26

Photovoltaic

Israel builds photovoltaics in the occupied Palestinian territories

11-26

Photovoltaic

Xianna Optoelectronics and American Grape Solar signed a strategic cooperation agreement

11-26

Collect
Comment
Share

Retrieve password

Get verification code
Sure