On April 18, 2022, the Chongqing Municipal Public Resource Trading Supervision Network released the preliminary survey and design bidding announcement for the reconstruction and expansion project of the Liangping to Changshou section of the National Expressway (G42, G50). The cost is about 11.105 billion.
Project Overview
The route starts from Jindai Town, Liangping District. It is planned that the intersection of Liangkai Expressway and the existing Liangchang Expressway will be rebuilt and expanded along the original road of the existing Liangchang Expressway, passing through Dianjiang County, and ending at Taiping, Changshou District, the end point of the renovation and expansion, with the existing Yuchang Expressway. Expand capacity and plan the intersection of the second phase of Changshou branch line of Yanjiang Expressway and the existing Liangchang Expressway. The total length of the project route is 96.7 kilometers. Except for the restricted road sections, which are partially newly built, the rest of the road sections are generally widened on both sides, and some road sections are rebuilt and expanded into an eight-lane expressway by means of one-sided widening, with a design speed of 100km/h and a roadbed width of 41%. Meter. 11 bridges of 1670 meters across the whole line, 19 middle bridges of 1282 meters, and 38 small bridges of 855 meters, including 1 bridge with a main span of 160 meters, a total of 3807 meters / 68 bridges, accounting for 3.9% of the route length ; No tunnels; 10 interchanges, including 3 hubs and 7 general interchanges. The estimated total cost of the project is 11.105 billion yuan, with an average cost of about 115 million yuan per kilometer.
Obtaining tender documents
This bidding project adopts the whole process of electronic bidding. Bidders can download bidding documents and other materials on the Chongqing Public Resource Trading Network before bidding. The deadline for submitting documents is 10:30 on May 12, 2022. Editor/Sang Xiaomei
Comment
Write something~