Recently, with the last concrete entering the form, the continuous beams of the 6 bids of the Shuijiang Avenue double-line super bridge in front of the Chongqing-Qianjiang section of the Chongqing-Xiang High-speed Railway, which was constructed by the China Railway 18th Bureau Group Tunnel Company, were successfully closed, marking the bridge in this bid section. Construction has progressed in stages.
The Shuijiang Avenue double-track super bridge with continuous beams is 835.45 meters long, 12.6 meters wide and 144 meters long. It is the first continuous beam of the 10 bridges in this bidding section.
After the completion of the Chongqing-Xiang high-speed railway, it will further strengthen the connection between the Chengdu-Chongqing economic circle and the urban agglomeration in the middle reaches of the Yangtze River and the west bank of the strait, and realize the one-hour high-speed railway connection between the main urban area of Chongqing and the Wulingshan urban agglomeration in southeastern Chongqing.Editor/Ma Xue
Comment
Write something~