On June 20, 2022, a construction mobilization meeting was held for the newly built Pingdingshan-Luohe-Zhoukou high-speed railway in Henan Province.
Pingluo Zhou High Speed Rail
According to reports, the Pingluozhou high-speed railway is an important part of the main skeleton of the national comprehensive three-dimensional transportation network. The line starts from Pingdingshan West Station in the west and ends at Zhoukou East Station in the east. There are four stations in the middle: Pingdingshan South, Wuyang North, Luohe West and Zhoukou West. The two ends are respectively connected with the Jiaoluoping section of the Hunan high-speed railway, the Zhengyu high-speed railway and the Zhengfu high-speed railway, with a total length of 199.673 kilometers. The planned construction period of the project is 3.5 years, and the planned total investment is about 39.8 billion yuan.
In order to ensure the realization of the goal of the early start of the Pingluozhou project, Henan Railway Construction Investment Group adhered to the project as king and the wall chart, sorted out and clarified 68 important matters, time nodes and responsible persons in 7 stages, and kept a close eye on the goals and nodes. , press stubble to advance the various work in the early stage of the project. At present, the feasibility study of the project has been reviewed, and the prerequisites for the approval of the feasibility study have been completed.
Accelerating the construction of the Pingluozhou high-speed railway is an important measure to implement the decision and deployment of the CPC Central Committee and the State Council to appropriately advance infrastructure construction, stabilize the economic market, and serve the economic and social development of Henan Province. After the completion of the Pingluozhou high-speed railway, it can form a new channel from northwest China to the Yangtze River Delta region via the hinterland of the Central Plains. significant. Editor/He Yuting
Comment
Write something~