Product
CRRC's first complete wind turbine product rolls off the production line
Seetao 2022-07-13 10:34
  • This batch of products will be invested in the main areas of the onshore Three Gorges Project in Jilin Province
Reading this article requires
3 Minute

On the morning of July 11, 2022, the off-line ceremony of the first complete wind turbine product of CRRC Songyuan New Energy Equipment Industrial Park was held in Yadahong Industrial Concentration Zone, Ningjiang District, Songyuan City. At the ceremony site, CRRC Songyuan Keixing Company signed a wind and scenery resource development agreement with the counties, cities and districts of Songyuan City. CRRC Shandong Wind Power Company signed a wind power industry cooperation agreement with its main partners.

Offline products

The wind turbine products that have been rolled off the production line this time adopt the mature overall design scheme of horizontal axis, three-blade, upwind direction design, and pitch adjustment, which can realize "four determinations" - power customization, tower height customization, design Customized parameters and customized control strategies have the advantages of "four highs" - high power generation, high reliability, high adaptability and high industrial chain synergy. It is an innovative product tailored by CRRC for Jilin.Editor/Ma Xue

Comment

Related articles

Product

Yidaxinneng will present N-type module solutions at SNEC 2024!

06-19

Product

Hesheng Silicon Industry full chain independent manufacturing shine SNEC 2024!

06-18

Product

Delivery of 1200 ton wind power installation platform for Chinese ships

07-27

Product

Yancheng Canadian Solar energy storage products enter the market

06-29

Product

China's first large cruise ship Aida Modu officially out of dock

06-07

Product

Zoomlion " Jinpeng " سلسلة 23mpa سيارة مضخة الوزن

06-02

Collect
Comment
Share

Retrieve password

Get verification code
Sure