Hydropower
8 billion yuan! Pumped storage project settled in Houma, Shanxi
Seetao 2022-08-10 11:54
  • The project is located in the Jinsha section of Zijinshan, Houma City, with an installed capacity of up to 900,000 kilowatts
  • In the future, it will play a positive role in improving the local ecological environment and developing the cultural tourism industry
Reading this article requires
4 Minute

The pumped storage project will further promote the realization of the dual-carbon goal. On August 9, 2022, Houma City, Shanxi held a signing ceremony for the project docking between the Municipal People's Government and China Energy Construction Group Shanxi Electric Power Construction Co., Ltd.

At the signing ceremony, witnessed by the leaders of the meeting, Houma Municipal People's Government and China Energy Construction Group Shanxi Electric Power Construction Co., Ltd. signed a pumped-storage power station project with a total investment of 8 billion yuan.

The signing of the pumped-storage power station project with China Energy Construction Group Shanxi Electric Power Construction Co., Ltd. is not only a major achievement of Houma City's project construction, but also a major achievement of the implementation of the energy revolution task, and it is also Houma City and China Energy Construction Group deepen friendship , a major achievement of strengthening cooperation, which is of great significance for promoting the optimal combination of traditional energy and new energy in Houma City, and empowering all-round promotion of high-quality development.

It marks the beginning of the in-depth cooperation between Houma City and China Energy Construction Group Shanxi Electric Power Construction Co., Ltd. It is hoped that the two parties can take this signing meeting as an opportunity to carry out wider, wider and deeper cooperation. At the same time, Houma will ensure the early start of the project with the optimal environment and the best policies, and promote the energy development work of Houma City to write a new chapter, and all-round high-quality development will yield fruitful results. Editor / Xu Shengpeng


Comment

Related articles

Hydropower

Mechanical and electrical installation of Lushan pumped storage power station begins

09-29

Hydropower

All rotors of the three units at Yangqu Hydropower Station have been lifted and installed

09-25

Hydropower

The first unit of Jiangsu Jurong Pumped Storage Power Station generates electricity

09-24

Hydropower

China Railway 23rd Bureau wins bid for Zhejiang Jiangshan Pumped Storage Project

09-24

Hydropower

Hebei Luanping Pumped Storage Power Station R2 Highway started

09-23

Hydropower

9.876 billion, Shaanxi Shahe pumped storage power station project started

09-10

Collect
Comment
Share

Retrieve password

Get verification code
Sure