On August 17, 2022, Quanzhou City launched a video link to commemorate the 20th anniversary of the "Jinjiang Experience". The major projects in Quanzhou began to start construction. The Nanan Urban and Rural Water Supply Integration Project started the video link on behalf of Nan'an. The groundbreaking ceremony was held in East Tianzhen was held ceremoniously.
Nan'an Urban and Rural Water Supply Integration Project
According to reports, the integrated urban and rural water supply project in Nan'an is a key livelihood project and a major infrastructure project in Nan'an during the 14th Five-Year Plan period. The planned total investment is 2.345 billion yuan, the total construction area is 42,500 square meters, and the total water supply scale is 197,000 tons/day. Among them, 5 large-scale water plants (138,000 t/d) were newly built, 2 large-scale water plants were renovated and expanded (70,000 t/d); 20.25km of new raw water transmission lines and 6 water pressure pumping stations were newly built; The total length of the water distribution pipeline network is 628.57km, and there are 57 water distribution pressurized pump stations; 16 independent village-level water supply projects and 3 decentralized water supply projects are newly built. The implementation of the project can optimize the allocation of water resources, create a new model of urban and rural water supply integration, and further establish And improve the urban and rural water supply security system from the source to the leading, comprehensively improve the quality of water supply and management level, in order to achieve leapfrog development of urban and rural water supply, solve the problem of unbalanced and insufficient people's livelihood security, implement rural revitalization, achieve catch-up and build a beautiful Nan'an , has very important practical significance.
Among them, the water supply main pipe project from Chenggong Science and Technology Park to Dongtian Town is part of the urban and rural water supply integration project in Nan'an City, with a planned total investment of 38.3336 million yuan. The total length of the newly built water distribution pipe network in the Dongtian section is 15,292 meters, which will benefit more than 50,000 people.
The start of construction marks that the project has entered the stage of physical project implementation and construction, which is of milestone significance and will soon change the status quo that there is no running water in Dongtian Town. My town will take this concentrated start of construction as an opportunity to strengthen communication and cooperation with water companies to promote the rapid construction, early production and long-term effects of urban-rural water supply integration projects, so that the masses can drink clean, safe and happy water as soon as possible. Editor/He Yuting
Comment
Write something~