Transportation
Bidding for Intercity Rail Transit from Foshan West to Guangzhou North Section
Seetao 2022-08-19 10:39
  • The total estimated budget approved for this project is 22.641 billion yuan, and the total construction period is 60 months
  • The total length of the project line is 47.023 kilometers, and there are 9 stations on the whole line
Reading this article requires
5 Minute

On August 16, 2022, the general contract bidding announcement for the construction of the section from Foshan West Station to Guangzhou North Station of the Pearl River Delta Intercity Rail Transit Guangfo Ring Line was released. The project is about to enter the formal construction stage with a planned construction period of 5 years.

Project Overview

The construction site of the Pearl River Delta Intercity Rail Transit Guangfo Ring Line from Foshan West Station to Guangzhou North Station (Guangfo West Ring Intercity) is located in Guangzhou and Foshan. The project starts from Foshan West Railway Station and passes through Nanhai District, Huadu District and Baiyun District. Stop at Guangzhou North Railway Station. The total length of the line is 47.023 kilometers. There are 9 stations on the whole line, including Foshan West, Shishan, Dalan, Guanyao South, Hegui, Tanbu, Huadugang, Shenshan North, Guangzhou North and other stations, and 7 new stations. The project has 1 vocational training section of the intercity railway. The total estimated budget for the project approval is 22.641 billion yuan, and the total construction period of the project is 60 months.

Main technical standards

Railway grade: intercity railway; number of main lines: double lines; design speed: 200 km/h, speed limit in local sections; distance between main lines: 4.2 meters; minimum curve radius on plane: 2200 meters in general areas and 1300 meters in difficult areas; Maximum gradient: 30‰; effective length of arrival and departure line: 400 meters; traction type: electric traction; EMU type: CRH6 intercity EMU; train operation control mode: CTCS-2+ATO automatic control system. Keywords: engineering news, engineering construction information, engineering construction

Bidding scope

The construction general contracting project from Foshan West Station to Guangzhou North Station of Guangfo Ring Line includes the following contents:

Bid opening time and place

Bid opening time: 9:30 on September 13, 2022 - 11:00 on September 13, 2022; Bid opening location: Academic Lecture Hall on the second floor of Guangzhou Public Resources Trading Center. Editor / Zhao E

Comment

Related articles

Transportation

67.255 billion! The construction of the Shanghai Hangzhou high-speed railway has started

07-09

Transportation

19.4 billion yuan! Winning the bid for Hubei Expressway Project

07-09

Transportation

Over 100 billion yuan! Kazakhstan launches petrochemical industry investment plan

07-09

Transportation

China Kazakhstan cooperation! Zhonghe Technology Helps Astana Light Rail Project Landing

07-09

Transportation

Infrastructure Projects | Shanxi's 5 Major Highway Projects Approved

07-07

Transportation

The bridge project of the Uma high-speed section has entered the stage of erecting beams

07-07

Collect
Comment
Share

Retrieve password

Get verification code
Sure