On August 17, 2022, the National Development and Reform Commission approved the feasibility study report on the construction of the second line of the Jinghe-Alashankou section of the Lanxin Railway. The project starts from Jinghe Station, passes through Bole City, Alashankou City, and connects to Alashankou Station. The total length of the line is 70 kilometers. The railway grade is National Railway Class I, the design speed is 120 kilometers per hour, and the total investment of the project is 3.455 billion yuan. The implementation of this project is of great significance for promoting the joint construction of the Belt and Road Initiative, smoothing domestic and international circulation, and improving the transportation capacity and service level of China-Europe freight trains.
The construction of the project is the need to help the construction of the corridor in the Silk Road Economic Belt and to create a new highland for China's development and opening up to the outside world. etc. are of great significance. Editor / Xu Shengpeng
Comment
Write something~