On the morning of August 22, 2022, the construction of the Minjiang Main Stream Flood Control Improvement Project (Fuzhou Section) officially started.
Minjiang Main Stream Flood Control Improvement Project
At present, the flood control and upgrading project of the main stream of the Minjiang River (Fuzhou section) has been included in the 150 major water conservancy projects in the country. The construction scope of the project is the Minhou and Cangshan sections of the main stream of the Minjiang River, with a planned total investment of 1.61 billion yuan, reconstruction of 32.12 kilometers of flood control dykes, and a new pumping station and sluice gate. The project benefits include flood control, waterlogging drainage and ecological water replenishment, which can effectively improve the flood defense capability of the Minjiang River and the waterlogging drainage capability in the reserve.
After the completion of the Minjiang Main Stream Flood Control Improvement Project (Fuzhou Section), the flood control levee in Cangshan District (including Luozhou Section, Tianfu Section, and Chengmen Section) will be upgraded to the 100-year standard, and the flood control levee of Longxiang Island in Minhou County will be raised to 50 Once a year standard.
It is understood that since 2022, the construction of 74 major water conservancy projects in Fuzhou has been vigorously and orderly. , stabilizing investment, and stabilizing the fundamentals of the economy have provided strong support. Editor/He Yuting
Comment
Write something~