On August 31, 2022, the Anhui Provincial Department of Transportation released the evaluation results of the SY-LM01 tender section of the pavement engineering construction bidding for the Baoyi-Yingshang Nanzhao section of the Hefei-Zhoukou Expressway and the Anhui section of the Fuyang-Huaibin Expressway According to the announcement, the project is divided into 5 bidding sections with a total mileage of about 130 kilometers, and 5 units including CCCC Second Highway Engineering Bureau Co., Ltd. won the bid.
Project Overview
The construction sites of this project are located in Huainan City, Lu'an City and Fuyang City, Anhui Province.
The starting point of the project from Shouxian Baoyi to Yingshang Nanzhao section of Hefei-Zhoukou Expressway is located in Jinjiaying, Baoyi Town, Shouxian County, connecting with G0321 Deshang Expressway, and reserved construction conditions for extending eastward; , after passing through the south of Anfengtang in Shou County and the north of Yinghe Town, cross the Pi River into the territory of Huoqiu County, in the territory of Huoqiu County, after passing through the north of Panji Town and the north of Chengdong Hubei, cross G328, about 5 minutes downstream of Linhuaigang Gate It crosses the Huaihe River at a distance of 1 km, passes through the Jiangtang Lake flooding area, crosses the old route of the Huaihe River and enters Yingshang County, passes through the experimental area of Balihe Nature Reserve, the north of Runhe Town, the south of Shengtang Township and the south of Gengpeng Town, and in the north of Nanzhao Town Crossing G105 and Fuliu Railway, the end point is near Hongzhuang, Yingshang County, and connects with G35 Jiguang Expressway. The total length of the route is 94.482 kilometers, and the estimated total investment is 14.913 billion yuan. There are 4 extra-large bridges, 5 bridges, and 20 small and medium-sized bridges on the whole line. Set up 8 interchanges in Baoyi, Shuangmen, Yinghe, Panji, Huoqiubei, Balihe, Runhe, and Nanzhao; set up 41 separate interchanges; set up 5 toll stations, 2 service areas, and maintenance work areas 2 other supporting facilities. Main line surface structure: 4cm AC-13+6cm AC-20C+8cm AC-25C+36cm cement stabilized gravel+20cm low dose cement stabilized gravel.
The project route of the Anhui section of Fuyang-Huaibin Expressway starts from Santaji Town, Yingzhou District, Fuyang City, and connects to Chuxin Expressway, and ends at Balizhuang, Funan County, the boundary of Anhui and Henan Province. The total length of the route is 35 kilometers, and the estimated investment is 4.918 billion yuan. The project has set up 1 extra-large bridge, 8 bridges, and 20 separate interchanges. The total length of the bridges is 15.495 kilometers, accounting for 44.3% of the total length of the route; 1 hub interchange and 1 service interchange; 1 service area and 1 maintenance area Office, 1 traffic police barracks and other supporting facilities. The whole line adopts the standard construction of two-way four-lane expressway, the design speed is 100 km/h, the roadbed width is 26 meters, and the asphalt concrete pavement is used. Main line surface structure: 4cm AC-13+6cm AC-20C+8cm AC-25C+36cm cement stabilized gravel+20cm low dose cement stabilized gravel. Keywords: engineering news, engineering construction information, engineering construction
Bidding Information
The first bidder for the FH-LM01 bid: CCCC Second Highway Engineering Bureau Co., Ltd.; the first bidder for the FH-LM02 bid: Anhui Communications Construction Co., Ltd.; the bid winner for the SY-LM01 bid 1st place: Shaanxi Road and Bridge Group Co., Ltd.; 1st place winning candidate for SY-LM02 bid: CCCC Second Navigation Engineering Bureau Co., Ltd.; 1st place winning candidate for SY-LM03 bid: CCCC No. One Engineering Co., Ltd. Congratulations to the winning bidder!Editor/Zhao E
Comment
Write something~