Recently, the G4222 Hexian-Xiangyang Expressway from Feixi (Fengle) to Shucheng (Qianrenqiao) section of G4222 and the section from Shucheng (Qianrenqiao) to Jinzhai (Anhui-Henan boundary) project was approved for development in Anhui Province The reform commission approved, laying a solid foundation for the early start of construction of the project.
Feixi to Shucheng to Jinzhai Expressway
According to reports, the G4222 Hexian-Xiangyang Expressway from Feixi (Fengle) to Shucheng (Qianrenqiao) to Jinzhai (Wan-Henan) section starts from the north side of Fengle Town, Feixi County, Hefei City, and connects to G3 Beijing Taiwan Expressway, westward through the north of Fengle Town Planning Area, through Shucheng County, Jin'an District, Huoshan County, Jinzhai County of Lu'an City, and then connected to the Jigongshan to Shangcheng section of the Dabieshan Expressway under construction in Henan Province. The project has a total length of about 180.4 kilometers and a total investment of about 26.806 billion yuan. Among them, the section from Feixi (Fengle) to Shucheng (Qianren Bridge) is about 9.9 kilometers long, with a project investment of about 2.052 billion yuan, and the section from Shucheng (Qianren Bridge) to Jinzhai (Wanren Bridge) is about 170.5 kilometers long. The investment is about 24.754 billion yuan.
In the future, with the implementation of this project, it will be necessary to implement the integrated development strategy of the Yangtze River Delta and the outline of the 14th Five-Year Plan of Anhui Province, improve the comprehensive three-dimensional transportation network layout of the country and Anhui Province, enhance the radiation and driving ability of the Hefei metropolitan area, and speed up the old revolutionary base area of Dabie Mountain. revitalization and development are of great significance. Editor/He Yuting
Comment
Write something~