On September 9, 2022, the Zhengzhou Municipal Public Resources Trading Center released the announcement of the selection of candidates for the bid by the owner of the Dengfeng Daxiongshan Pumped Storage Power Station Project. The project was won by Xinjiang Xinhua Hydropower Investment Co., Ltd., with an investment scale of 7 billion yuan.
Project Overview
The Dengfeng Daxiongshan pumped storage project initially plans to have an installed capacity of 1,200MW and a static investment of about 7 billion yuan. The two parties will cooperate in the fields of energy conservation and environmental protection, water environment management, and efficient use of water resources.
The implementation of the project will provide strong support for Dengfeng City to achieve energy structure adjustment, clean energy industry development, carbon peaking and carbon neutrality, continue to optimize the energy structure during the 14th Five-Year Plan, and promote the rise of green development. Keywords: engineering news, engineering construction information, engineering construction
At the same time, the completion of the hydropower station plays an important role in accelerating the construction of a new power system for Dengfeng City, ensuring the safe operation of the power grid, promoting the comprehensive utilization of water resources, and promoting the development of local tourism and other related industries.Editor/Zhao E
Comment
Write something~