Recently, the Jinan Yaoqiang Airport Phase II Reconstruction and Expansion Project Construction Promotion Meeting was held in Jinan, which marked the start of the construction phase of the project.
Jinan Yaoqiang Airport Phase II Reconstruction and Expansion Project
According to reports, the overall planning and construction plan of the Jinan Yaoqiang Airport Phase II Reconstruction and Expansion Project is drawn from a high starting point. The team of Cui Kai and He Jingtang, academicians of the Chinese Academy of Engineering, jointly with the Civil Aviation Planning and Design Research Institute, Singapore Changi Airport Authority and other top domestic and foreign leaders The design team carries out the planning and design of the terminal area, the flight area and the working area, aiming at building a "four-type airport" that is safe, green, intelligent, and humanistic, and adopts a large number of new materials, new processes and green and low-carbon technologies, and strives to build a leading domestic , world-class, a new landmark of the city that highlights the characteristics of Shandong and embodies the charm of Qilu. The T2 terminal adopts an innovative six-finger corridor configuration, with a large centralized and small scattered layout, surrounded by the center, divided passengers, divided check-in, and divided security inspection, to build an all-round smart airport system with smart management, smart guidance, and smart security. Provide passengers with an efficient, personalized and safe travel experience. At the same time, a new "1+5" integrated development model of port-industry-city integration of hub+service, hub+park, hub+park, hub+logistics, hub+growth point was introduced to integrate planning and design with airport economic zone and comprehensive bonded zone, etc. Linked development.
On August 23, 2022, the Civil Aviation Administration of China and the provincial government jointly approved the preliminary design and budget estimates of the project, marking that the project is ready for construction. According to the approval, the second-phase reconstruction and expansion project of Jinan Yaoqiang Airport mainly includes four major projects: airport, air traffic control, fuel supply and airline base. Among them, the airport project includes the terminal area project (a new 600,000-square-meter T2 terminal building, a 380,000-square-meter comprehensive transportation center and parking building), and the flight area project (2 new 3,600-meter runways, supporting taxiways and stations) Ping) and work area project, introducing Jibin high-speed railway and 3 subways. After the project is completed, Jinan Airport will have 3 runways and a terminal building of nearly 800,000 square meters, and the flight level will be upgraded to the highest level of 4F, which can meet the annual passenger throughput of 55 million and cargo and mail throughput of 520,000 tons. To meet demand, integrate airports, high-speed railways, rail transit, expressways, and urban expressways into one, realize zero-distance transfer and seamless connection, and become a world-class, domestically leading modern airport and the largest comprehensive aviation transportation hub in the province.
It is reported that Jinan Yaoqiang Airport Phase II Reconstruction and Expansion Project is a major landmark project for the conversion of new and old kinetic energy in Shandong Province, a leading project in the Shandong Demonstration Area of a powerful transportation country, and an important comprehensive transportation hub project in the province. It is a major measure for Shandong to open up new heights to the outside world. After the completion of the project, Jinan Airport will be built into a modern comprehensive aviation hub integrating air, rail, rail and land. In order to speed up the construction of Jinan's new and old kinetic energy conversion starting area and national-level airport economic demonstration area, it will build an international comprehensive transportation hub city. Provide strong support.
It is reported that in recent years, Shandong has made every effort to build a leading modern airport group in China. In 2021, Qingdao Jiaodong Airport will be relocated and relocated overnight, and Heze Peony Airport will be officially opened. The number of transport airports in the province will reach 10, ranking first in East China. In 2022, construction of the second phase of Jinan Airport reconstruction and expansion, Zaozhuang New Airport and other projects will start, and the construction of three projects including the second phase of Yantai Airport, Jining Airport relocation, and Linyi Airport terminal reconstruction and expansion will be accelerated; Airport, Weihai Airport relocation, Weifang Airport relocation and other projects. During the 14th Five-Year Plan period, the total investment in Shandong airport infrastructure will exceed 80 billion yuan, and efforts will be made to build a modern airport cluster on the Shandong Peninsula, providing a solid guarantee for accelerating the construction of the Shandong Demonstration Zone, a strong transportation country. Editor/He Yuting
Comment
Write something~