Macro
The 14th Five-Year Plan for Energy evelopment in Ningxia was officially released
Seetao 2022-09-14 10:53
  • By 2025, strive to double renewable energy power generation, with an installed capacity exceeding 50 million kilowatts
  • The proportion of non-fossil energy consumption in primary energy consumption will increase to about 15%
Reading this article requires
5 Minute

On September 13, 2022, the "14th Five-Year Plan" for energy development in Ningxia Hui Autonomous Region was released. The plan proposes that by 2025, the comprehensive energy production capacity will reach about 88 million tons of standard coal, and the installed power capacity will reach more than 90 million kilowatts. Renewable Energy power generation has doubled, with an installed capacity exceeding 50 million kilowatts and striving to reach 55 million kilowatts. The proportion of non-fossil energy consumption in primary energy consumption will increase to about 15%, the proportion of renewable energy consumption will increase to more than 30%, and the proportion of non-water renewable energy consumption will increase to more than 28%.

Adjust and optimize coal power structure. Rationally build advanced coal power according to development needs, allocate coal power capacity that has been included in the national plan, timely promote the construction of clean coal power projects based on cogeneration, and gradually promote the transformation of coal power from the main power source to the regulated and supportive power source. Part of the existing coal-fired power units will be adjusted to new inter-provincial DC channel supporting power sources, which will effectively improve the utilization efficiency of coal power and promote the harmonious development of coal power and renewable energy power generation in the "West-to-East Power Transmission" power base. Relying on the pilot work of regional integration of coal power resources, strengthen the main responsibility of regional key enterprises, formulate an implementation plan for the "three reforms and linkages" of coal power units, and in accordance with the principles of classified disposal and supply guarantee, orderly eliminate outdated coal power production capacity, and give priority to outdated units. Switch to emergency backup power. Editor / Xu Shengpeng


Comment

Related articles

Macro

EU's demand for battery energy storage to surge tenfold by 2030

07-04

Macro

Zoomlion and China Railway 25th Bureau reached a strategic cooperation

07-04

Macro

China oil and Kazakhstan sign energy cooperation agreements

07-02

Macro

100 billion! The cooperation project between and China Coal Group is ready to start

07-01

Macro

Decoding the dark horse Hefei: the counterattack code of a central city

06-30

Macro

335MW! China Power Construction signed EPC contract in South Africa

06-25

Collect
Comment
Share

Retrieve password

Get verification code
Sure