On September 13, 2022, the "14th Five-Year Plan" for energy development in Ningxia Hui Autonomous Region was released. The plan proposes that by 2025, the comprehensive energy production capacity will reach about 88 million tons of standard coal, and the installed power capacity will reach more than 90 million kilowatts. Renewable Energy power generation has doubled, with an installed capacity exceeding 50 million kilowatts and striving to reach 55 million kilowatts. The proportion of non-fossil energy consumption in primary energy consumption will increase to about 15%, the proportion of renewable energy consumption will increase to more than 30%, and the proportion of non-water renewable energy consumption will increase to more than 28%.
Adjust and optimize coal power structure. Rationally build advanced coal power according to development needs, allocate coal power capacity that has been included in the national plan, timely promote the construction of clean coal power projects based on cogeneration, and gradually promote the transformation of coal power from the main power source to the regulated and supportive power source. Part of the existing coal-fired power units will be adjusted to new inter-provincial DC channel supporting power sources, which will effectively improve the utilization efficiency of coal power and promote the harmonious development of coal power and renewable energy power generation in the "West-to-East Power Transmission" power base. Relying on the pilot work of regional integration of coal power resources, strengthen the main responsibility of regional key enterprises, formulate an implementation plan for the "three reforms and linkages" of coal power units, and in accordance with the principles of classified disposal and supply guarantee, orderly eliminate outdated coal power production capacity, and give priority to outdated units. Switch to emergency backup power. Editor / Xu Shengpeng
Comment
Write something~