Henan Xinyang Huancheng Expressway I Project Bidding
Seetao 2022-09-14 15:06
  • Xinyang Kechuang Road project covers an area of ​​about 12.06 mu, with a total length of 657m
  • Xinyang Baiyunshan Road Project: covers an area of ​​about 37.56 mu, with a total length of 1216m
Reading this article requires
23 Minute

On September 10, 2022, the Xinyang Public Resource Trading Platform released the EPC general contract bidding announcement for the Huancheng Expressway I project in Xinyang City, Henan Province. The project construction site is located in Xinyang City, with a planned total investment of about 8.857 billion yuan.

Project Overview

Xinyang Xinbaishi Street Rapid Reconstruction Project: The total length of the project road is 3.317km, and the planned red line is 50m wide. The whole line from Nanjing Avenue to the North Ring Road adopts the roadbed renovation + elevated scheme, with a total of 4 pairs of entrances and exits. The ground expressway adopts two-way six-lane main line + two-way six-lane auxiliary road. The current status of the whole line can be roughly divided into two sections, Nanjing Avenue ~ Buyun Road: the main road in the city, the current road is 50m wide, with 6 lanes in both directions, and sidewalks in some sections have not yet been constructed. Buyun Road ~ Beihuan Road: Simple through-passage road, the current road width is 20m. The main construction contents include road engineering, bridge engineering, traffic engineering, lighting engineering, water supply and drainage engineering, electric power engineering, communication engineering, greening and landscape engineering, etc.

Xinyang Kechuang Road Project: covers an area of about 12.06 mu, the total length of the route is 657m, the road grade adopts the city main branch road, the road planning red line is 12m wide, and the design speed is 30km/h. Including road engineering, water supply and drainage engineering, traffic engineering, lighting engineering, electrical engineering, communication engineering, greening engineering and ancillary engineering within the red line of the road;

Xinyang Yuying Road Project: The total length of the project route is 659m, covering an area of about 30.94 mu. The road grade adopts the urban sub-arterial road, the road planning red line is 30m wide, and the design speed is 40km/h. Including road engineering, water supply and drainage engineering, traffic engineering, lighting engineering, electrical engineering, communication engineering, greening engineering and ancillary engineering within the red line of the road;

The project on the east side of Rongsheng Huafu on Yunmeng Road, Xinyang City: covers an area of about 42.02 mu, with a total length of 1357m. Including road engineering, water supply and drainage engineering, traffic engineering, lighting engineering, electrical engineering, communication engineering, greening engineering and ancillary engineering within the red line of the road;

Xinyang Xinsan Road Project: Covering an area of about 42.02 mu, the total length of the route is 870 meters. The road grade adopts the main branch road in the city. The planned red line is 30m wide and the design speed is 30km/h. Including road engineering, water supply and drainage engineering, traffic engineering, lighting engineering, electrical engineering, communication engineering, greening engineering and ancillary engineering within the red line of the road;

Xinyang Baiyunshan Road Project: covers an area of about 37.56 mu, the total length of the route is 1216m, the road grade adopts the city main branch road, the road planning red line is 20m wide, and the design speed is 30km/h. Including road engineering, water supply and drainage engineering, traffic engineering, lighting engineering, electrical engineering, communication engineering, greening engineering and ancillary engineering within the red line of the road;

Xinyang Taoxi Road Project: covers an area of about 38.95 mu, the total length of the route is 1263m, the road grade adopts the urban main branch road, the road planning red line is 20m wide, and the design speed is 30km/h. Including road engineering, water supply and drainage engineering, traffic engineering, lighting engineering, electrical engineering, communication engineering, greening and landscape engineering and auxiliary engineering within the road red line;

Xinyang New Eleventh Avenue Project: covers an area of about 47.62 mu, the total length of the route is 633m, the road grade adopts the urban trunk road, the road planning red line is 50m wide, and the design speed is 50km/h. Including road engineering, water supply and drainage engineering, traffic engineering, lighting engineering, electrical engineering, communication engineering, greening engineering and ancillary engineering within the red line of the road;

Xinyang City New Thirteenth Avenue Project: covers an area of about 41.24 mu, the total length of the route is 1338m, the road grade adopts the urban main branch road, the road planning red line is 20m wide, and the design speed is 30km/h. Including road engineering, water supply and drainage engineering, traffic engineering, lighting engineering, electrical engineering, communication engineering, greening engineering and ancillary engineering within the red line of the road;

Xinyang Jinglong Street Project: covers an area of about 51.10 mu, the total length of the route is 1679m, the road grade adopts the urban branch road, the road planning red line is 20m wide, and the design speed is 30km/h. Including road engineering, water supply and drainage engineering, traffic engineering, lighting engineering, electrical engineering, communication engineering, greening engineering and ancillary engineering within the red line of the road;

The project from Yuying Road, Xin34th Street, Xinyang City, to Xinshisan Avenue, covers an area of about 102.04 mu, with a total length of 2049m. The road grade adopts the urban primary and secondary roads. The planned red line of the road is 30m wide and the design speed is 40km/h. Including road engineering, water supply and drainage engineering, traffic engineering, lighting engineering, electrical engineering, communication engineering, greening engineering and ancillary engineering within the red line of the road;

Xinyang City Tiexi Road New Seventh Avenue to New Thirteenth Avenue project: covers an area of about 45.26 acres, the total length of the route is 983m, the road grade adopts the urban primary and secondary roads, the road planning red line is 30m wide, and the design speed is 40km/h. Including road engineering, water supply and drainage engineering, traffic engineering, lighting engineering, electrical engineering, communication engineering, greening engineering and ancillary engineering within the red line of the road;

Xin7 Avenue to New 13 Avenue Project, Jingyuan Road, Xinyang City: covers an area of about 45.6 mu, the total length of the route is 990m, the road grade adopts the city main branch road, the road planning red line is 30m wide, and the design speed is 30km/h. Including road engineering, water supply and drainage engineering, traffic engineering, lighting engineering, electrical engineering, communication engineering, greening engineering and ancillary engineering within the red line of the road;

Xinyang City Greening Water System New Fifth Avenue to New Thirteen Avenue Project: The total area is 197 mu, mainly for the construction of water system and greening.

Xinyang Civil Aviation Center Project: Construction scale: covers an area of about 18.4 mu, with a total construction area of about 36,792 square meters, construction content: mainly to build a civil aviation center; process technology: some of the prefabricated components are used, and the decoration materials are green, formaldehyde-free plates, etc.; Main equipment: energy-saving air conditioners, water pumps, fans, etc.

Nanjing Road Rapid Reconstruction Project: The total length of the project road is 14.426km, the planned red line width is 40m, 50m, 55m, the two-way six-lane urban trunk road standard is adopted, and the design speed is 60km/h. There are 2 node bridges and 2 node tunnels on the whole line. The intersections of other trunk roads and the ground level intersection of nodes are controlled by traffic lights, and the secondary trunk roads and branch roads are in the form of right in and right out. The main construction contents of this project include roads, bridges, tunnels, water supply and drainage, transportation, lighting, electricity, communication, greening and landscape engineering, etc. Other municipal pipeline networks such as heat, gas, and national defense optical cables are not within the scope of this project design.

Science and Technology Future Center Project: Construction scale: covers an area of about 19.62 mu, with a total construction area of about 56,893 square meters, construction content: mainly to build a class-A office building, a science and technology incubation center; process technology: some use prefabricated components, and the decoration materials are green , Formaldehyde-free sheet, etc.; main equipment: energy-saving air conditioners, water pumps, fans, etc.

Future Lakeside · No. 8 Courtyard: Construction scale: covers an area of about 50.19 mu, with a total construction area of about 117,113 square meters, construction content: mainly to build supporting housing; process technology: some of the prefabricated components are used, and the decoration materials are green, formaldehyde-free plates, etc. ; Main equipment: energy-saving elevators, water pumps, fans, etc. Keywords: engineering news, engineering construction information, engineering construction

Construction scale of Yunxiang Business Center (GTX7-1): covers an area of about 26 mu, with a total construction area of about 74,037 square meters. Construction content: mainly to build Grade A office buildings; process technology: some prefabricated components are used, and the decoration materials are green and non-toxic Aldehyde plates, etc.; main equipment: energy-saving air conditioners, water pumps, fans, etc.

Obtaining tender documents

All bidders who intend to participate in this project, please log on to the website of Xinyang Public Resource Trading Center (www.xyggzyjy.cn) to register the transaction entity independently, fill in the company information and upload the scanned copy of the original according to the relevant requirements of the website announcement. Bring the original copy to the Xinyang Public Resource Trading Center for review. After completing the registration of the enterprise integrity database, you must apply for a CA digital certificate before you can handle bidding related services online. After logging in to the membership system with the CA digital certificate, the bidder can click the online prompt Download Bidding Documents and Materials for Free Download time for bidding documents: September 13, 2022 to September 19, 2022. Deadline for submission of bidding documents: 9:30 on October 9, 2022.Editor / Zhao E


Comment

Related articles

Transportation

Kunming Changshui International Airport Terminal Renovation and Expansion Project Starts

09-29

Transportation

Beijing Pinggu Local Railway New Construction Project begins

09-27

Transportation

Colombia launches 5G highway innovation project

09-22

Transportation

The section from Jitong Railway to Zhelimu is about to open!

09-19

Transportation

Brazil Belo Horizonte Metro Line 2 starts!

09-19

Transportation

The construction of the Linyi section of the Weisu high-speed railway started

09-18

Collect
Comment
Share

Retrieve password

Get verification code
Sure