News
Zhejiang Jiande Pumped Storage Power Station starts construction
Seetao 2022-09-16 11:24
  • The project is a daily regulation pumped storage power station with a designed annual power generation capacity of 2.4 billion kWh
Reading this article requires
2 Minute

On the morning of September 15, 2022, the commencement ceremony of the preparatory project for the Zhejiang Jiande Pumped Storage Power Station was held in Meicheng Town.

The power station covers an area of about 161.44 hectares, with a total investment of 14.05 billion yuan, and was built by GCL Energy Technology Co., Ltd. It is planned to build six 400,000-kilowatt pumped-storage units with a total installed capacity of 2,400 megawatts, equivalent to three Xin'anjiang hydropower stations.

After the power station is put into operation, it will deliver a steady stream of green energy to the Zhejiang Power Grid. It is estimated that the annual coal consumption will be saved by about 480,000 tons, and the carbon emission will be reduced by 960,000 tons.Editor/Ma Xue

Comment

Related articles

News

Cross border tourism between China and Vietnam continues to be hot

10-10

News

Over 4 million people have entered and exited the China Vietnam border at the estuary port

10-08

News

Lanzhou New Area: Accelerate the construction of a logistics hub along the Belt and Road

09-30

News

The direct flight from Shanghai to Venice has set sail

09-30

News

China Railway Construction won the bid for the Weisu high-speed rail project

09-29

News

Double track railway continuous steel truss arch bridge begins to cross the Yellow River

09-29

Collect
Comment
Share

Retrieve password

Get verification code
Sure