Under the background of global accelerated energy transformation, the construction of new energy base in Inner Mongolia has been accelerated On September 28, 2022, the Energy Bureau of Inner Mongolia Autonomous Region approved the implementation of three types of market-oriented new energy consumption projects, including renewable energy substitution of coal-fired self-owned power plants with integrated source network and storage and integrated demonstration projects of wind and solar hydrogen production. 17 new energy consumption projects are mainly distributed in Hohhot, Baotou, Ordos, Xilin Gol and Tongliao, with a total new energy scale of 6.985 million kilowatts, including photovoltaic scale of 3.155 million kilowatts and wind power scale of 3.83 million.
According to the principle of classification evaluation, objective evaluation and scientific evaluation, seven demonstration projects were evaluated and optimized from the aspects of hydrogen energy demand, new energy scale allocation, hydrogen production scheme and hydrogen energy utilization, including three in Ordos City, two in Tongliao City, one in Baotou City, one in Xilin Gol League, and one in building new energy of 1.68 million kilowatts, including 1.24 million kilowatts of wind power, 440,000 kilowatts of photovoltaic, 63,000 tons/year of hydrogen production by electrolysis of water Editor/Xu Shengpeng
Comment
Write something~