Central enterprises
China Railway Sixth Bureau won the bid for the Shenzhen-Jiangmen Railway project
Seetao 2022-10-14 11:38
  • The main line of the new Shenzhen-Jiangmen railway is 116.309 kilometers long, and 98.4 percent of the line is bridge and tunnel
  • The total length of the main line of the winning bid section is about 4.302 kilometers, and the main project volume is the temporary land acquisition of 208.93 mu
Reading this article requires
5 Minute

Recently, the Sixth Bureau of China Railway won the bid to build a new line project between Shenzhen and Jiangmen Railway, with the winning amount of 2436576434 yuan, which adds another wing to the construction of Guangdong-Hong Kong-Macao Greater Bay Area and Shenzhen Special Economic Zone.

Schematic diagram of circuit

As an important part of the "eight vertical and eight horizontal" high-speed railway, Shenzhen-jiang high-speed railway is a major transport infrastructure supporting the construction of the Guangdong-Hong Kong-Macao Greater Bay Area. It is the first fast railway linking the core cities of the Pearl River Delta with western Guangdong, which is of great significance to the rapid development and economic revitalization of the Greater Bay Area.

The total length of the main line of the new Shenzhen-Jiangmen railway project is 116.309 kilometers, including 69 kilometers of Bridges and 45 kilometers of tunnels. The proportion of Bridges and tunnels of the new line is 98.4%. The project adopts the general contracting mode of construction and is divided into 12 bidding sections

China Railway Sixth Engineering Bureau successfully won the bid for SJSG-4 section

Notice of award

The main line of the bid section is about 4.302km in length, located on both sides of the East Station of Shenzhen Airport. The main works are temporary land acquisition of 208.93mu, road bridge replacement of 800 square meters, single hole single line shield tunnel 2918m, open tunnel 1490m, the whole line of ballast bed 27.366km, signal grounding 4.302km, drainage 4.302km.

Since 2022, with the complex industry environment and the superposition of multiple pressure state of the economy, China railway, always maintain strategic concentration six innings, anchoring quality development goals, improve the pattern of big business, improving the quality of management has the winning project with high quality, make a positive contribution to the steady growth of contributions to power transportation construction, to greet the 20 big victory party congress with honors. Editor/Zhao E

Comment

Related articles

Central enterprises

The 12th Hydropower Bureau and the Zhejiang Emergency Department build a rescue alliance

08-19

Central enterprises

XCMG Group and Rio Tinto Group sign a global cooperation framework agreement

08-15

Central enterprises

China Power Construction and State power Investment leaders to deepen energy cooperation

07-20

Central enterprises

China Construction Third Engineering Bureau Zhejiang Transportation Project

07-18

Central enterprises

5.635 billion yuan! China Energy Construction won the bid for Jinneng Phase III project

07-15

Central enterprises

National Railway Administration and Chongqing City Sign Cooperation Agreement

07-04

Collect
Comment
Share

Retrieve password

Get verification code
Sure