Central enterprises
33.9 billion! CSCEC Announces Major Projects
Seetao 2022-10-24 10:27
  • In this major project, the basic setting category totaled 12.19 billion, accounting for 36%
  • The major project announcements released this time are mainly divided into two categories: housing construction and infrastructure
Reading this article requires
14 Minute

Recently, CSCEC announced 33.9 billion major projects:

The major project announcements released this time are mainly divided into two categories: housing construction and infrastructure. Among them, the housing construction category totaled 21.7 billion yuan, and the infrastructure category totaled 12.19 billion yuan. It can be seen that infrastructure accounts for 36% of the major projects, which shows that CSCEC is still very aggressive in infrastructure projects. The real estate sector has reached its peak, so CSCEC is now working hard in the infrastructure sector. Next, let's look at some specific key projects:

Saudi Arabia Project

In September 2022, the consortium consisting of CSCEC, Spanish FCC and Saudi SAJCO signed a general contract for the construction of the second and third bid sections of the Saudi Arabian traffic tunnel project in mountainous areas with NEOM Company, a wholly-owned company under the Saudi sovereign fund PIF.

The project includes two parallel high-speed passenger railway tunnels and heavy freight railway tunnels, with a single track length of 15.75km. The main work includes excavation of pilot tunnel and main tunnel, initial support, waterproofing, secondary lining and construction of middle partition wall.

This project is the largest transportation and public infrastructure project in Saudi Arabia, and also the pilot project of NEOM New City "The Line". It is a necessary component and an important milestone to ensure that NEOM continues to meet its development plan, so as to realize the new future vision of 2030 formulated by Crown Prince Mohammed Bin Salman, Chairman of the Board of Directors of NEOM.

The Saudi traffic tunnel project, jointly implemented by CSCEC International and CSCEC Middle East, is the first project for CSCEC to enter the Saudi market, which is of great significance to the subsequent Saudi market development. This project is also another overseas large-scale tunnel project implemented by CSCEC International following the Tel Aviv Green Line Metro in Israel, the Sri Lanka Water Diversion Tunnel and the Northeast Trunk Line Project in Australia.

China Construction Third Engineering Bureau

China Construction Third Engineering Bureau won the bid for the general contracting project of Yangtze River Smart Pool Park and surrounding municipal supporting facilities project in the Binjiang Science and Technology New Area of Echeng District, Ezhou, Hubei Province with a price of 2.26 billion yuan. The project won the bid by the general contracting company and the general design institute, including the construction of the new laser industrial park and municipal roads, which will speed up the eastward expansion of the Optical Valley Science and Innovation Corridor and the integration of Wuhan and Hubei, and help Hubei build a leading area for the construction of a new development pattern in the country.

The EPC project of Agricultural Bank of China Inner Mongolia Data Center Construction Project undertaken by China Construction Third Engineering Bureau is of great significance. With a bid price of 3.99 billion yuan, it is the largest infrastructure project in the history of the Agricultural Bank of China and also a data center project attracting public attention.

As the general contractor of construction, China Construction Third Engineering Group Co., Ltd. will further give play to its advantages in management technology and the whole industry chain, allocate excellent teams, gather high-quality resources, and promote project construction with high level, high quality and efficiency to ensure that the project is built into a highlight project and a benchmark project.

The EPC project of Agricultural Bank of China Inner Mongolia Data Center Construction Project is located at the southwest end of Yungu District, Helingeer New District, Inner Mongolia, with a floor area of about 209 thousand square meters, including 6 machine room buildings, 4 power buildings, 2 spare parts warehouse buildings, 1 production, operation and maintenance support building, and 2 substations. It is the largest data center of Agricultural Bank of China in China.

After the completion of the project, it will reach about 10000 racks, with an installed capacity of 129000 servers. It will improve the overall disaster recovery layout of the data center of the Agricultural Bank of China, meet the needs of marine data analysis and storage in the digital transformation, and meet the needs of various resources in the transformation of autonomous and controllable technology architecture; Meet the financial ecological cooperation needs of banks and governments, banks and schools, banks and hospitals, and banks and enterprises, and build a national first-class green data center.

China Construction Seventh Engineering Bureau

The EPC project of the Sunshine Lake Area Project in Kaifeng, Henan Province, won the bid with 2.94 billion yuan by China Construction Seventh Engineering Bureau. As a model area built in Kaifeng, the project will effectively improve the ecological environment of the Yellow River basin, optimize the allocation of water resources, and promote high-quality development of the whole basin, which is of great significance for improving the living environment of the ancient city of Kaifeng and improving the quality of life of the local people.

China Construction Eighth Engineering Bureau

The EPC project of Shandong Rizhao Haiyun Plaza Smart Trade Complex Project, which was won by China Construction Eighth Engineering Group Co., Ltd. with 3.2 billion yuan, demonstrates the strong competitiveness of China Construction Eighth Engineering Group Co., Ltd. Project overview: Rizhao Haiyun Plaza Smart Trade Complex Project has a total construction area of 378790 square meters, mainly building a super high-rise high-end office building, a high-rise apartment building, a super high-rise apartment building, an underground garage and other supporting facilities.

CSCEC has accumulated 2726.7 billion new contracts in the first three quarters of 2022, with a year-on-year growth of 11.2%. Finally, congratulations on the growing strength of CSCEC and its engineering bureaus! Editor/Zhao E

Comment

Related articles

Central enterprises

The 12th Hydropower Bureau and the Zhejiang Emergency Department build a rescue alliance

08-19

Central enterprises

XCMG Group and Rio Tinto Group sign a global cooperation framework agreement

08-15

Central enterprises

China Power Construction and State power Investment leaders to deepen energy cooperation

07-20

Central enterprises

China Construction Third Engineering Bureau Zhejiang Transportation Project

07-18

Central enterprises

5.635 billion yuan! China Energy Construction won the bid for Jinneng Phase III project

07-15

Central enterprises

National Railway Administration and Chongqing City Sign Cooperation Agreement

07-04

Collect
Comment
Share

Retrieve password

Get verification code
Sure