Transportation
Bidding for Xi'an Xingping Expressway Reconstruction and Expansion Project
Seetao 2022-10-26 11:52
  • The planned duration of the project is 36 months, and the total investment of the project is 4.349 billion yuan
  • The project is an important channel connecting Xi'an Ring Road and Lianhuo Expressway, with a total length of 24.443km
Reading this article requires
6 Minute

On October 25, 2022, Shaanxi Public Resources Trading Center released the announcement of the general contracting bidding for the design and construction of the reconstruction and expansion project of Xi'an Xingping Expressway. The tenderee of the project is Shaanxi Transportation Holding Group Co., Ltd., the planned construction period is 36 months, and the total investment of the project is 4.349 billion yuan.

Project overview

Construction site: Fengdong New City, Fengxi New City, Qindu District, High tech Zone, Xingping City, Xixian New District, Shaanxi Province.

Project scale: Xi'an Xingping Expressway is an important channel connecting Xi'an Ring Road and Lianhuo Expressway (G30), which is responsible for the transportation of Xi'an vehicles entering and leaving Xianyang City, and vehicles in the north of Xi'an passing through Xianyang to the west. The implementation of this project is of great significance to effectively improve the regional transportation conditions, enhance the radiation capacity of Xi'an as a national central city, speed up the improvement of transportation quality and efficiency, accelerate the development of regional economy along the line, and promote the process of integration of Guanzhong Plain urban agglomeration and Xixian. The starting line of the project starts from the east side of Sanqiao Toll Station, connects with urban roads, expands along existing roads to the west, passes through Fengdong New City, Fengxi New City, Qindu District, High tech Zone and Xingping City of Xianyang City, ends at the Xiwu hub interchange, and connects with G30 Lianhuo Expressway, with a total length of 24.443 kilometers. Keywords: engineering news, engineering construction information, engineering construction

Section division

Others: It is planned to enter the site in December 2022, with a planned construction period of 36 months and a defect liability period of 24 months.

Acquisition and submission of bidding documents

Those who are interested in participating in the bidding should purchase the bidding documents from 12:00 on October 25, 2022 to 23:59 on October 30, 2022, with the letter of introduction of the unit, the ID card of the operator and the online bid confirmation form. The deadline for submission of bid documents is 14:00 on December 23, 2022. The bidder shall submit the bid documents to 409 Bid Opening Room of Shaanxi Public Resources Trading Center before 14:00 on December 23, 2022. Editor/Zhao E

Comment

Related articles

Transportation

Shanghai Zhoudeng Expressway officially starts construction

10-15

Transportation

The terminal building of Dalian New Airport has started construction!

10-14

Transportation

70 billion yuan intercity railway project is coming!

10-14

Transportation

Seymour is about to build a road

10-12

Transportation

The Kazakhstan Mongolia highway connection is about to be launched

10-12

Transportation

Jiangsu Changzhou Metro Line 6 starts construction

10-07

Collect
Comment
Share

Retrieve password

Get verification code
Sure