Recently, at the construction site of No. 3 unit in Qianqing Wind Farm of Jilin Oilfield, with the first section of tower weighing 84 tons, 5.2 meters in diameter and 22 meters in height slowly rising, the first fan of PetroChina's first wind power project was successfully lifted, marking a new step for Jilin Oilfield from the traditional oil industry to the integrated development of new energy.
The project is an important part of the 150000 kilowatt self consumption solar power project under construction in Jilin Oilfield, including 18 wind turbine generator units with a total installed capacity of 78000 kilowatts. It is estimated that the annual on grid power is about 2604337 megawatt hours, and the annual equivalent full load is 3395 hours.
The project is under the responsibility of China Petroleum Engineering&Construction Corporation and will enter the site construction stage in early August 2022. Up to now, the foundation, cushion cap and other construction links have been completed, and the hoisting conditions have been met. Besides, the construction of other booster stations, high-voltage lines, communication systems and other supporting facilities is progressing as planned, and it is expected to be grid connected for power generation by the end of the year. At that time, Jilin Oilfield will make substantial progress in self consumption and clean replacement of electric power.
At present, Jilin Oilfield is accelerating the launch of 150000 kilowatt wind power, 550000 kilowatt wind power and 1.3 milion kilowatt wind power projects.Editor/Ma Xue
Comment
Write something~