On December 15, 2022, Huaneng Shantou Lemen Offshore Wind Power Project, the landmark project of Huaneng's ten million kilowatt "integration of wind, water, fire and storage" energy base in eastern Guangdong, was commenced.
Huaneng's East Guangdong "integration of wind, solar, water, fire and energy storage" energy base integrates offshore wind power, photovoltaic, clean thermal power, energy storage and other sectors, with a total installed capacity of more than 20 million kilowatts and a total investment of more than 180 billion yuan. It has simultaneously built the first control center of the integrated energy base in East Guangdong, innovatively promoting the organic combination of green energy and chemical energy storage, forming a unified scheduling of "wind, light, water, fire and storage", and realizing friendly interaction between sources and networks The overall benefit is optimal.
Huaneng Shantou Lemen Offshore Wind Power Project
It is located in the south sea area of Nan'ao Island, with a construction scale of about 600000 kilowatts and a total investment of about 8.2 billion yuan. It is planned to be fully connected to the grid by September 2023. After the project is completed, the annual average power generation will be 2 billion kWh, the standard coal will be saved about 650000 tons, and the carbon dioxide emissions will be reduced about 1.8 million tons. The construction and operation of the project will effectively give play to the advantages of regions rich in new energy and realize large-scale consumption of clean electricity.Editor/Ma Xue
Comment
Write something~