Transportation
Xinjiang Jinan Flyover to Aiweigou to Alehui Town Highway Project Bidding
Seetao 2023-01-12 16:15
  • The total length of the main line of the project is 111.85 kilometers, and the estimated total cost of the project is 3.829 billion yuan
  • 51.1 km from the starting point of the project to Heishan Coal Mine is constructed according to the standard of Class I highway
Reading this article requires
7 Minute

On January 10, 2023, the Chinese government procurement website released the bidding announcement of the PPP project of government and social capital cooperation for the highway project from Jinan Interchange to Aiweigou to Alehui Town of S103 line. The estimated total cost of the project is 3.829 billion yuan, with an average cost of 30.66 million yuan per kilometer.

Project overview

The project consists of the main line and connecting line of S103 Jinan Interchange to Aiweigou to Alehui Town. The starting point of the main line is at the intersection of the Ji'nan Interchange connecting line of Urumqi S103 and G30 lines, and the ending point is at the intersection of S103 and S301 lines on the west side of Alehui Town, Toksun County, which generally runs from north to south. The starting point of the connecting line is at the level crossing of Line Z401 and Line S103, and the ending point is at Aiweigou Coal Mine. Main control points: Jinan Interchange, Tori Township, Yangquangou, S301 Line, Alehui Town, Tianshan Grand Canyon National Forest Park, Heishan Coal Mine, etc.

The total length of the main line of the project is 111.85 km. The 51.1 km section from the starting point to Heishan Coal Mine is constructed according to the standard of Class I highway, and the rest sections are mainly constructed according to the standard of Class II highway. Among them, the starting point of Tori Township is 11.8 km, the design speed is 80 km/h, the width of the integrated subgrade is 22.5 m, and the width of the separated subgrade is 11.25 m+12 m; 39.3 km from Tori Township to Heishan Coal Mine, with a design speed of 60 km/h and an overall subgrade width of 20 meters; The section from Heishan Coal Mine to Aiweigou is 19.16 km, the design speed is 60 km/h, and the subgrade width is 10 meters; The 41.59 km section from Aiweigou to the terminal will be reconstructed. The connecting line of the project is 13.02 km long, and the existing Class IV highway is reconstructed. Key words: engineering news, engineering construction information, engineering construction

There are 1710 m/10 large bridges, 663 m/10 medium bridges, 476 m/24 small bridges and 318 culverts in the main line; 2 long tunnels of 4261m; There are 3 parking areas, 1 observation platform, 2 toll stations and 9 escape lanes. The design vehicle load class of bridges and culverts is highway - Ⅰ. Necessary traffic engineering and facilities along the line shall be constructed simultaneously.

Acquisition and submission of bidding documents

Potential tenderees are requested to collect the bidding documents from the Xinjiang Uygur Autonomous Region Public Resources Trading Platform from January 11, 2023 to February 6, 2023. The deadline for submission of documents is 11:00 on February 7, 2023. The place of bid opening is the Xinjiang Uygur Autonomous Region Government Affairs Service and Public Resources Trading Center. Editor/Zhao E


Comment

Related articles

Transportation

Shaanxi Xi'an-Ankang high-speed railway Zhen'anxi station officially started

09-13

Transportation

Shaanxi Province Xi'an to Shiyan high-speed railway Shangluoxi station officially started

09-13

Transportation

The Qinyu River Bridge in Zhushan County, Shiyan City, Hubei Province started

09-10

Transportation

Qingdao Changsha Road and Jinshui Road cross-line bridges were opened to traffic

09-09

Transportation

The Hangzhou-Wenzhou high-speed railway was officially opened to traffic

09-09

Transportation

Holly Road, Lu'an City, Anhui Province started!

09-06

Collect
Comment
Share

Retrieve password

Get verification code
Sure