Transportation
Bidding for Shaoxing Section of Ningbo-Jinzhou Expressway Reconstruction Project
Seetao 2023-01-29 11:58
  • Shaoxing section has a total length of 73.4km, a total area of 615.985 hectares, and a total length of bridges of 10.892km
  • The main line of the project adopts the standard construction of two-way 8-lane expressway, and the estimated total investment of the project is 13.711 billion yuan
Reading this article requires
5 Minute

Recently, the Shaoxing Public Resources Trading Network released the bid invitation announcement for the Ningbo-Jinhua Section (Shaoxing Section) of the Ningbo-Jinhua Expressway Reconstruction and Expansion Project. The Shaoxing City Highway and Transportation Management Center is the bidder for this project. The estimated total investment of the project is 13.711 billion yuan .

Project Overview

Ningbo-Jinhua section (Shaoxing section) reconstruction and expansion project of Ningbo-Jinhua Expressway is located near the junction of Fenghua, Ningbo and Xinchang, Shaoxing. The starting point is K42+250. It is routed from east to west, and the Chenggongling Tunnel is set up to Shengzhou through Shaxi Town, Xinchang. Jinting Town, via Huangze Town, Jingkai District, Sanjiang Sub-district, Lushan Sub-district, Ganlin Town, the end point is located in Baifengling Tunnel, Changle Town, and the end point is K115+650.

The total length of the Shaoxing section is about 73.4km, including 5.78km in Xinchang and 67.62km in Shengzhou. The total length of bridges along the line is 10.892km, and the total length of tunnels is 4.270km. The project will renovate 2 hubs, renovate 5 general interchanges, novate 1 service area, add 1 new Jinting Interchange, 1 new Changchangle service area, and add a 2.7km Changchangle Interchange connecting line. The Shaoxing section has a total land area of 615.985 hectares, 209.020 hectares of newly requisitioned land, and 80,465 square meters of house demolition.

technical standard

The main line of this project adopts the two-way 8-lane expressway standard, with a design speed of 100km/h, a partial road section at the junction with Ningbo at 80km/h, and a roadbed width of 41m. The connection line adopts the two-way four-lane first-class road standard, the design speed is 60km/h, and the width of the roadbed is 23m. Keywords: engineering news, engineering construction, engineering construction information

Obtaining tender documents

Anyone who intends to participate in the bidding, please download the bidding documents on the electronic bidding trading platform of Shaoxing Public Resources Trading Center from 8:30 on January 20, 2023 to 17:00 on February 1, 2023. The deadline for submission of bidding documents The time is 9:30 on February 15, 2023. Editor / Zhao E


Comment

Related articles

Transportation

Colombia launches 5G highway innovation project

09-22

Transportation

The section from Jitong Railway to Zhelimu is about to open!

09-19

Transportation

Brazil Belo Horizonte Metro Line 2 starts!

09-19

Transportation

The construction of the Linyi section of the Weisu high-speed railway started

09-18

Transportation

Xiangjing Railway in Hubei Province is expected to open to traffic in 2025!

09-16

Transportation

Shaanxi Xi'an-Ankang high-speed railway Zhen'anxi station officially started

09-13

Collect
Comment
Share

Retrieve password

Get verification code
Sure