Construction
The world's tallest bridge in the earth's cracks: Guizhou Huajiang Gorge Bridge
Seetao 2023-02-09 11:34
  • Huajiang Gorge Bridge is the highest bridge in the world with the highest vertical height from the bridge deck to the water surface
  • The bridge is one of the control projects of Lu'an Expressway. It is expected to be capped in March 2023 and completed in 2025
Reading this article requires
3 Minute

The Huajiang Gorge Bridge was built on the Huajiang Gorge, known as the Great Crack of the Earth. Now, the two main towers of the bridge have stood upright on both sides of the gorge, and the scene is very busy.

The Huajiang Gorge Bridge spans the deep mountain canyon between Guanling County, Anshun City and Zhenfeng County, Qianxinan Prefecture. The total length of the bridge is 2890 meters. It is the main control project of Lu'an Expressway. The main bridge is a steel truss stiffened beam suspension bridge with a span of 1420 meters. The vertical distance between the bridge deck and the water surface is 625 meters,

It is reported that there are 49 kilometers in Zhenfeng County of Lu'an Expressway, with a total investment of 8.1 billion yuan in Zhenfeng Section. There are four bid sections, starting from Huajiang Canyon Bridge. The route passes through Pingjie, Beipanjiang, Zhexiang, and Wanlan towns, and there are three landing interchange toll stations, namely Pingjie, Beipanjiang, and Zhenfeng (North). Since the official commencement of construction in September last year, the construction party has overcome technical problems such as the lifting and accuracy correction of the hexagonal main cable tower.Editor/Ma Xue

Comment

Related articles

Construction

Shuangyashan Green Aviation Fuel Base officially launched

10-16

Construction

The autumn centralized construction of China's first heavy-duty Daqin Railway

10-08

Construction

The reconstruction project of the main trunk canal in Heihexi, Gansu Province was started

09-30

Construction

Jingzhou Libu Yangtze River Railway Bridge enters the main tower construction stage

09-29

Construction

Tuyi Technology Foshan Intelligent Manufacturing Base Project started

09-29

Construction

The Jingjiang River section waterway regulation project has started construction

09-27

Collect
Comment
Share

Retrieve password

Get verification code
Sure