Recently, the No. 9 Hydropower Bureau won the bid for Section 1 of the infrastructure project of the Pierrefond Community in Mauritius.
Mauritius Pierrefont Community Infrastructure Project
It is understood that the Mauritius Pierrefont community infrastructure project is located in the Heihe District of Mauritius. The main construction content includes the construction of 10.5 kilometers of asphalt roads, 2.7 kilometers of fences and power grids, various drainage structures, provision of various road facilities, supply, installation and trial operation 8.6 kilometers of water supply and sewage pipelines, construction of power and communication facilities, etc., the project duration is 730 days.
This project is the 22nd project won by the Ninth Hydropower Bureau in the past 13 years of intensive development in the Mauritius market. It is another result of relying on the group's high-end platform to promote the localization of international operations, give full play to the advantages of integration, promote the market on-site, and protect the market on-site.
Bids 2 and 3 of Sierra Leone Rural Bridge Project
Recently, the Ninth Bureau of Hydropower won the bid for the 2nd and 3rd bids of the Sierra Leone Rural Bridge Project, successfully entered the Sierra Leone market, and entered the overseas business territory again. Sierra Leone is located in West Africa, bordering the Atlantic Ocean, with superior natural conditions, a sound legal system, and good social security. In terms of economic construction, Sierra Leone vigorously develops agriculture, forestry, fishery, mining and infrastructure, promotes export growth, and implements a strategy of economic diversification. At present, China-Serbia economic and trade cooperation mainly focuses on mining development, infrastructure construction and fishing and other fields.
The project is a local livelihood project. The main construction content is to design and build two rural bridges to replace the original manual cable ferries. The bridge deck is equipped with two-way lanes and sidewalks. Lot 2 of the project is located at Matttru Jong Ferry, Punt District, southwest of Sierra Leone, and Lot 3 is located at Gendema Ferry, Kenema District, southeastern Sierra Leone. After the project is completed, it can provide local residents with safe, efficient, fast and convenient travel conditions, play a positive role in the local transportation industry, and further help the prosperity and development of the local economy and society.
In recent years, relying on the projects under construction, the Ninth Bureau of Hydropower has implemented the integrated strategy of contract performance and marketing of projects under construction through regional marketing and joint marketing, and practiced the concept of promoting the market on the spot. The market territory has continued to expand, which has strongly promoted the international The high-quality development of business and the process of building a modern and strong company. Editor/He Yuting
Comment
Write something~