Central enterprises
National Energy Group won the right to develop pumped storage power stations
Seetao 2023-03-24 10:58
  • Zhongwei Sandaoyuan Pumped Storage Power Station Ningxia Electric Power's first pumped storage project
  • Zhongwei Sandaoyuan Pumped Storage Power Station is located in Shapotou District, Zhongwei, Ningxia, with a planned installed capacity of 1.6 million kilowatts
Reading this article requires
4 Minute

On March 20, 2023, the Development and Reform Commission of Ningxia Hui Autonomous Region announced the winning bid for the selection of investment entities for pumped storage power stations in the region. The consortium of National Energy Group Ningxia Electric Power and Yinchuan Innovation and Development Investment Group Co., Ltd. won the 1.6 million kilowatts of Zhongwei Sandaoyuan Development rights for pumped storage projects.

This project is the first pumped storage project of Ningxia Electric Power, which marks a new breakthrough of the group company in Ningxia's industrial planning. is of great significance.

Zhongwei Sandaoyuan 1.6 million kilowatts pumped storage project site selection and geomorphology

The Sandaoyuan Pumped Storage Power Station is located in Shapotou District, Zhongwei, Ningxia. The planned installed capacity of the power station is 1.6 million kilowatts. It is planned to install four reversible hydroelectric generating units with a single unit capacity of 400,000 kilowatts. The rated flow rate is 78.50 cubic meters per second. The drop is 485 meters, and the adjusted storage capacity is 7.74 million cubic meters. After the completion of the project, it will form a large-scale comprehensive energy delivery base of "integrated wind, fire and storage" with the supporting power supply of "Ningxiang DC", which is an indispensable and important part of the new regional power system. Quality is implemented, the construction of the Yellow River Basin ecological protection and high-quality development pilot zone, and the construction of the national new energy comprehensive demonstration zone have made positive contributions. Editor / Zhao E


Comment

Related articles

Central enterprises

The 12th Hydropower Bureau and the Zhejiang Emergency Department build a rescue alliance

08-19

Central enterprises

XCMG Group and Rio Tinto Group sign a global cooperation framework agreement

08-15

Central enterprises

China Power Construction and State power Investment leaders to deepen energy cooperation

07-20

Central enterprises

China Construction Third Engineering Bureau Zhejiang Transportation Project

07-18

Central enterprises

5.635 billion yuan! China Energy Construction won the bid for Jinneng Phase III project

07-15

Central enterprises

National Railway Administration and Chongqing City Sign Cooperation Agreement

07-04

Collect
Comment
Share

Retrieve password

Get verification code
Sure