News
CSSC equips the world's largest ship again
Seetao 2023-04-04 09:21
  • The world's largest new dynamic positioning shuttle tanker was delivered in Dalian, which was independently designed and built by China
  • Achieved a double breakthrough in the domestic shipping industry and shipbuilding industry
Reading this article requires
6 Minute

On March 30, 2023, the world's largest DP shuttle tanker "North Pioneer" equipped with CSSC generator sets was officially delivered, and CSSC once again launched the "SXD" market brand with its performance.

"North Pioneer" was commissioned by China Shipping Petrochemical Import and Export Co., Ltd. to China Shipbuilding Dalian Shipbuilding Co., Ltd. for the world's largest deep-water oil and gas field - Brazil's Buzios (Buzios) and Mero (Mero) oil fields. The oil tanker has completely independent intellectual property rights. The ship has a load of 155,000 tons, a total length of 279 meters, a molded width of 48 meters, and a molded depth of 23.7 meters. It adopts the industry-leading DP dynamic positioning technology (DP2) and a new generation of bow loading system. It has stable position control functions and higher lift. Oil security. The ship is the first new type of DP tanker built in accordance with the latest version of Petrobras' technical specifications, and it is also the largest DP tanker built in accordance with this standard in the world.

In March 2021, CSSC and DSIC joined hands again to carry out in-depth cooperation in the field of marine generator sets, and successfully signed a contract for a 155,000-ton shuttle tanker generator set project, further consolidating the position of CSSC products in the mainstream market of ships. CSSCMAN8L32/40 diesel generator set is selected as the power supply equipment for the tanker. The performance of the unit meets the IMO TIER III ship environmental protection emission standard, which can provide sufficient and reliable power guarantee for ship navigation.

The CSSCMAN8L32/40 diesel generator set is the most critical power supply equipment for the ship, and the production process has attracted much attention from the shipyard and shipowner. In 2022, facing the dual challenges of production tasks and epidemic prevention and control, CSSC will strictly control the production plan, product quality, and delivery of each node, carefully organize and advance in an orderly manner, and effectively guarantee the test delivery and after-sales installation of the unit in the factory. The successful completion of the debugging work once again handed in a satisfactory answer to the user.

The successful delivery of the "North Pioneer" once again proved the reliable quality of CSSC equipment to the market. In the future, CSSC will continue to help the development of the national shipbuilding industry and provide users with more high-quality guarantee power. Editor/He Yuting

Comment

Related articles

News

China Post's first intercontinental freight route officially operates

06-28

News

China's automated terminals rank first in the world

06-28

News

Italian scholar Fanti's ten-year love affair with China

06-28

News

Scientific and technological innovation helps China's modernization

06-26

News

Jiangsu Nanjing invests nearly 100 billion yuan to boost economic development

06-26

News

Investing 11 billion yuan! Inner Mongolia 2GW hydrogen production project signed

06-25

Collect
Comment
Share

Retrieve password

Get verification code
Sure