With the implementation of the Belt and Road Initiative in the world, China Railway 14th Bureau and Sinoma Construction actively expanded the overseas market of the Belt and Road Initiative, won the bid and signed a number of overseas mining projects, and contributed Chinese power to the local realization of efficient use of resources and economic development.
China Railway 14th Bureau won the bid for the Ecuador mine project
On April 19, 2023, China Railway 14th Bureau Group Overseas Company received a bid winning notice from the owner of the Mirador Copper Mine in Ecuador: Informing the company of winning the bid for the acid reservoir and 1# sedimentation tank of the northern mine dump of the Mirador Copper Mine Engineering, stope acid reservoir and stope interception and drainage project, the contract value is 6.682 million US dollars.
Successive bids for the two projects are achieved on the basis of high-standard and high-quality completion of the 2# acid reservoir and sedimentation tank project of the Mirador Copper Mine South Mine won by the China Railway 14th Bureau Group Overseas Company in September 2022 Its quality, progress, safety and civilized construction are fully affirmed by the owner.
For the two newly bid-winning projects, the Ecuador branch (office) has made careful preparations in terms of site inspection, construction organization design and optimization, personnel organization, and mechanical equipment preparation. At present, all preparatory work in the early stage of construction is carried out in an orderly manner, and all project staff have the confidence and ability to complete the project construction tasks efficiently and with high quality in accordance with the contract and requirements.
Sinoma signed two contracts in Nigeria
Recently, Tong Laigou, executive director of Sinoma Construction Company, and Mr. RABIU, chairman of BUA Group, held a high-level meeting. The two sides fully exchanged opinions on project implementation and follow-up further in-depth cooperation, and reached agreement on a series of matters. At the same time, successfully signed the Nigeria OSOSO mine operation and maintenance project, and the EDO3 line heavy oil system EPC project.
Tong Laigou expressed the hope that the two sides will further strengthen the high-level meeting mechanism, continue to enhance exchanges and communication between enterprises, and on the basis of deepening traditional cooperation such as cement engineering, increase the cultivation of new cooperation growth points such as green development and technological innovation, and continue to promote the cooperation between the two sides. High-quality, high-level strategic cooperation, and work together to create a new situation of mutual benefit and win-win development.
Mr. RABIU said that BUA Group will be committed to developing a closer strategic partnership with Sinoma Construction, promoting pragmatic cooperation between each other at a higher starting point, larger scope, and deeper level, and jointly writing a new chapter of deepening cooperation and seeking common development .
The successful signing of the OSOSO mine operation and maintenance project and the heavy oil system EPC project of the EDO3 line ensured the integrity of the EPC project under construction. Risks provide a solid guarantee for the steady and sustainable development of BUA Group's cement business.Editor/Ma Xue
Comment
Write something~