Construction Frontline
Construction of the Sierra Leone Bridge Contracted by Chinese Enterprises Starts
Seetao 2023-04-21 11:43
  • Lot 3 is located at Godama Ferry, Kenema District, southeastern Sierra Leone
  • This project is a major livelihood project in the Republic of Sierra Leone
Reading this article requires
7 Minute

A few days ago, PowerChina held a groundbreaking ceremony for Section 3 of the rural bridge in Sierra Leone, another livelihood project in Africa that was designed and constructed. President Bio of Sierra Leone and his wife attended the foundation stone laying ceremony of the 3rd bid for the rural bridge design and construction project undertaken by the No. 9 Hydropower Bureau of China Power Construction. The chief minister of the government of Sierra Leone, the minister of agriculture and forestry, the minister of engineering and public assets, and the minister of the environment attended the ceremony.

At the groundbreaking ceremony of the project, President Bio said that the project is a major livelihood project for the Republic of Sierra Leone. For many years, the human-powered ferry on the Saiwa River has been the only means of transportation connecting the two chiefdoms of Simbala and Wanda. The skyrocketing and rapid flow of the river has brought many inconveniences to the production and life of the residents. Building a bridge is the wish of the local people. The government of Sierra Leone will provide necessary assistance for the construction of the project. It is believed that the China Power Construction team can complete this high-quality project as soon as possible, benefiting the people on both sides of the strait and making new contributions to the friendship between China and Sierra Leone.

Speech by President Bio

Sierra Leone is located in West Africa, bordering the Atlantic Ocean, with superior natural conditions. On April 3, 2023, the Ninth Hydropower Bureau formally signed a contract with the Ministry of Agriculture and Forestry of the country through a joint venture for the 2nd and 3rd bids of the rural bridge design and construction project. Among them, the 2nd bid section of the project is located at the Mattrujong Ferry in the Bang District in the southwestern part of the country, and the 3rd bid section is located in the Godama District of the Kenema District in the southeastern part of the country. The main construction content is the design and construction of 2 rural bridges. To replace the original ferry, the bridge deck has two-way traffic and sidewalks.

Comparison chart before and after the project

After the completion of the project, it will provide safe, efficient, fast and convenient travel conditions for Sierra Leone residents, help to improve the layout of the local transportation network, have a positive effect on the local transportation industry, and further promote the prosperity and development of the local economy and society.

The friendship between China and Africa has a long history. PowerChina implements the strategy of going out, actively participates in infrastructure construction in Africa, and uses a series of livelihood projects to benefit the local area, conveying the profound friendship between China and Africa.Editor/Ma Xue


Comment

Related articles

Construction Frontline

Serbian President inspects Wreath Tunnel and comforts workers

11-26

Construction Frontline

China Road and Bridge Corporation signs contract for Uzbekistan road project

10-11

Construction Frontline

Antai New Energy signs contract with Indian EPC company for project

10-10

Construction Frontline

Papua New Guinea National Petroleum Building Pile Foundation Testing Project

10-09

Construction Frontline

Zhongjiang International signs contract for Vanuatu housing construction project

10-09

Construction Frontline

The first new energy project invested and constructed by China Datang in Central Asia

10-05

Collect
Comment
Share

Retrieve password

Get verification code
Sure