Central enterprises
Qugang Expressway Beijing-Taiwan Expressway to Huanghua Port Section Opens Bids
Seetao 2023-04-23 08:31
  • The franchise period of this project shall not exceed 43 years, of which the construction period shall not exceed 3 years
  • Qugang Expressway Beijing-Taiwan Expressway to Huanghua Port section has a total length of 85.51 kilometers and is constructed using the two-way 4-lane expressway standard
Reading this article requires
5 Minute

On April 21, 2023, a reporter from Jiandao.com learned from Hebei Bidding.com that the bid-winning candidate announcement for the Qugang Expressway Beijing-Taiwan Expressway to Huanghua Port Section Franchising (BOT) project has been released. The project is managed by Cangzhou Transportation Development Group 9 units including China Communications Road Construction Co., Ltd. won the bid, and the estimated total investment of the project is 14.278 billion yuan.

Project construction location: Cangzhou City, Hebei Province

Construction scale: Qugang Expressway Beijing-Taiwan Expressway to Huanghua Port section has a total length of 85.51 kilometers, adopts two-way 4-lane expressway standard construction, design speed 120 km/h, roadbed width 27 meters, super large bridge 1988m/2 seats, large bridge 2890m/ 10, medium and small bridges 630.4m/10, separate interchanges 6499.3m/18, 80 culverts, 97 passages, 1 overpass, 5 interchanges, including 2 hub interchanges, 2 service areas, There are 3 intercommunication toll stations, 1 port toll station, 2 maintenance work areas, and 1 monitoring and communication center.

Franchise period: The franchise period of this project shall not exceed 43 years, including two stages of construction period and operation period, of which: the construction period shall not exceed 3 years: from the date of commencement to the date of handover; the operation period shall not exceed 40 years: From the start of trial operation to the day before the project handover date; the charging period is subject to the approval of the Hebei Provincial Government. Keywords: engineering news, engineering construction, engineering construction information

Winning bid information

The first place in the bid for this project: Cangzhou Communications Development Group, Cangzhou Road and Bridge Engineering Co., Ltd., Hebei Provincial Transportation Planning and Design Research Institute Co., Ltd., Xingtai Road and Bridge Construction Group Co., Ltd., Shaanxi Traffic Control Municipal Road and Bridge Group Co., Ltd., China Communications Second Public Bureau Sixth Engineering Co., Ltd., China Communications Road and Bridge Construction Co., Ltd., Guizhou Bridge Construction Group Co., Ltd., and Xingtai Road and Bridge Construction Engineering Co., Ltd. Editor / Zhao E


Comment

Related articles

Central enterprises

The 12th Hydropower Bureau and the Zhejiang Emergency Department build a rescue alliance

08-19

Central enterprises

XCMG Group and Rio Tinto Group sign a global cooperation framework agreement

08-15

Central enterprises

China Power Construction and State power Investment leaders to deepen energy cooperation

07-20

Central enterprises

China Construction Third Engineering Bureau Zhejiang Transportation Project

07-18

Central enterprises

5.635 billion yuan! China Energy Construction won the bid for Jinneng Phase III project

07-15

Central enterprises

National Railway Administration and Chongqing City Sign Cooperation Agreement

07-04

Collect
Comment
Share

Retrieve password

Get verification code
Sure