Recently, the leading project of Guangzhou Airport Expressway Reconstruction and Expansion Project officially opened the EIA publicity for the section from the south of Liuxi River to the fifth line of Baiyun. According to the environmental assessment, the advanced project of the airport expressway expansion will start at the end of June 2023 and is expected to be completed in June 2024.
Guangzhou Airport Expressway
According to reports, the Guangzhou Airport Expressway is composed of two parts: the provincial expressway network S41 and the national expressway network G45. The S41 section of the provincial expressway network runs from south to north and starts at the intersection of Baiyun District and Beihuan Expressway in Guangzhou City. Yuanli Interchange ends at Baiyun International Airport. The current route has a total length of 24.07 kilometers. The G45 section of the National Expressway Network runs from north to south. The highway intersects the Banghu Interchange, and the current route has a total length of 30.3 kilometers.
According to the EIA, since the south of the Pingsha Interchange does not have the expansion conditions, the airport expressway expansion project starts from the Pingsha Interchange connecting the South China Expressway Phase III, and ends at the Beixing Interchange connecting the Beijing-Hong Kong-Macau Expressway. The length of the reconstruction and expansion project is about 42.091 kilometers. According to the characteristics of the project, it is divided into two sections, namely, the provincial network S41 of the airport expressway from Pingsha to Baiyun Airport and the national network G45 of the north extension of the airport.
The starting point of the Guangzhou Airport Expressway Reconstruction and Expansion Project, which is publicized in the environmental impact assessment, starts from the south of Liuxi River to the fifth line of Baiyun Road on the south side of Qinghe Erheng Road, and ends on the north side of Qinghe Lizhiji Road. It is separated on both sides of the existing airport expressway. There are 2 new lanes, the width of the roadbed is 15.25 meters, the design speed is 100 km/h, and the total length is 1.1 kilometers. There are 2 bridges and 2 new culverts along the whole line. The advanced project is located in the Pingsha-Benghu section of Guangzhou Airport Expressway Reconstruction and Expansion Project. Separate new one-way two-lane. Editor/He Yuting
Comment
Write something~