Central enterprises
G219 Line Zhaosu-Wensu Highway Construction Project Opens Bids
Seetao 2023-05-30 08:41
  • The project is divided into 3 bidding sections, with a total bidding price of about 9.813 billion yuan
  • The total length of the project is 86.093 kilometers, and it will be constructed according to the standard of first-class/second-class roads
Reading this article requires
5 Minute

On May 29, 2023, a reporter from Jiandao.com learned from the national public resource trading platform that the results of the general contract for the design and construction of the ZWSJ-1~3 contract section of the Zhaosu-Wensu Highway Construction Project on the G219 Line have been announced. Divided into 3 bidding sections, the total bidding price is about 9.813 billion yuan.

Project Overview

Construction site: Xinjiang Uygur Autonomous Region.

The ZWSJ-1~3 contract section of the Zhaosu-Wensu highway construction project of the G219 line starts from Xiate Township, Zhaosu County, Yili Prefecture, and ends near the Pochengzi Checkpoint in Wensu County, and then connects to the ZWSJ-4 contract section. The main control points passing along the line are Zhaosu County, Xiate Township, Muzhat Daban, Pochengzi, Bozidun Township, Tagerak Ranch, Tuohula Township, and Wensu County. The total length of the route is 86.093 kilometers. According to the first-class and second-class highway standards, the design speed is 60km/h and 80km/h; the width of the roadbed and road surface is 25.5/12.75, 10/7.5, and 12/10.5 meters; the design load of bridges and culverts is highway-class I .

The bidding for the general contracting of design and construction of this project is divided into 3 tender sections, and the division of tender sections is as follows:

Winning bid

The first winning bidder for the ZW-1 bid section: China Communications Road and Bridge Construction Co., Ltd. led the consortium with China Communications First Highway Survey and Design Research Institute Co., Ltd., and the bidding price was 4.44 billion yuan. The first winning bidder for the ZW-2 bidding section: a consortium led by China Communications First Highway Bureau Group Co., Ltd. and China Communications Second Highway Survey and Design Research Institute Co., Ltd., with a bidding price of 4.205 billion yuan. No. 1 winning bidder for Section ZW-3: a consortium led by Xinjiang Road and Bridge Construction Group Co., Ltd. and Xinjiang Academy of Transportation Sciences Co., Ltd., with a bidding price of 1.168 billion yuan. Congratulations to the winning bidder! Editor / Zhao E


Comment

Related articles

Central enterprises

China Energy Engineering Group (CEEC) plans to invest $1 billion to support Egypt.

09-11

Central enterprises

China Power Construction Corporation wins bid for 11.4 billion pumped storage project!

08-25

Central enterprises

3.9 billion! Chinese steel companies expand overseas steel mills on a large scale

08-19

Central enterprises

China International Engineering Corporation wins FEED contract for Xiba gas field in Iraq

08-19

Central enterprises

Registered capital of billions! Large energy investment group established

08-12

Central enterprises

29 billion! China Power Construction wins bid for Iraq seawater desalination project

08-08

Collect
Comment
Share

Retrieve password

Get verification code
Sure