Interconnection
The main body of the longest bridge in Bosnia and Herzegovina is connected
Seetao 2023-07-13 09:28
  • The Pochtley Bridge is a key project of the Pochtley Zverovich section of the Pan European 5C corridor
  • The completion of the bridge will significantly improve the transportation situation between Bosnia and Herzegovina and Croatia
Reading this article requires
6 Minute

Recently, the longest bridge in Bosnia and Herzegovina, the Pokily Bridge, contracted by Power Construction Corporation of China, ushered in a major node, and the connection of the main structure laid the foundation for opening the traffic channel between Bosnia and Herzegovina and Croatia.

Pochitli Bridge is the highest bridge in Bosnia and Herzegovina with the largest span and the highest construction difficulty. It is also a key project of the section from Pochitli to Zverovich of the Pan European 5C Corridor. The bridge is 945 meters long and 21.92 meters wide, and is constructed by the Power Construction Municipal Corporation of Power Construction Corporation of China. The connection of the main structure of the Bochitley Bridge marks another crucial milestone for the project.

The upper structure of the bridge adopts a variable cross-section prestressed continuous box girder, while the lower structure adopts polygonal hollow piers with varying thickness and cross-section, which are single span, two-way, and four lane, in a curved shape, and completed through hanging basket cantilever construction.

The Bochitley Bridge is the first bridge constructed by a Chinese enterprise in Bosnia and Herzegovina, and it is also the first time a Chinese enterprise has conducted third-party cooperation with the European Union in Bosnia and Herzegovina. The completion of the bridge will significantly improve the traffic conditions between Bosnia and Herzegovina and Croatia, greatly increase the traffic speed between Bosnia and Herzegovina and Ploče Port, Croatia, help to promote the economic development of Bosnia and Herzegovina region, strengthen the communication between the region and the EU, and help to strengthen the economic and trade exchanges and connectivity of the entire Balkan region.

Since Power Construction Corporation of China entered the Bosnia and Herzegovina market in 2012, it has undertaken many projects with milestone significance. Among them, Ivovik Wind Farm is the largest energy project invested and constructed by Chinese enterprises in Bosnia and Herzegovina. Recently, it won the "Best Foreign Investor Award" in Bosnia and Herzegovina, making it the only Chinese enterprise; The Solbus 132 MW photovoltaic project is the largest photovoltaic project in Bosnia and Herzegovina; The Youlegao Hydropower Station is the first hydropower station constructed by a Chinese enterprise in Bosnia and Herzegovina; The Skadimovac Grammow wind power project will become the largest wind power base in the country after completion.Editor/Ma Xue


Comment

Related articles

Interconnection

Chongqing-Tashkent,cooperation between the central and western and Central Asia accelerate

04-22

Interconnection

This wave is a surprise attack on your taste buds, and it's truly "yours"!

04-18

Interconnection

Chengdu launches the Central Asian freight train with fixed departure times

04-16

Interconnection

The cumulative cargo volume of the New Western Land-Sea Corridor has reached 4 million TEU

04-11

Interconnection

The Chinese rescue team completed its mission and returned to China from Myanmar

04-11

Interconnection

China Energy Engineering Group signed an agreement with the Vietnam Electricity Group

04-02

Collect
Comment
Share

Retrieve password

Get verification code
Sure