New Energy
Xinjiang's new energy installed capacity exceeds 50 million kilowatts
Seetao 2023-07-14 17:18
  • The installed capacity of new energy in Xinjiang has reached 50.26 million kilowatts, accounting for 41% of the total installed capacity
  • Relying on regional advantages, Xinjiang is accelerating the construction of large-scale wind power and photovoltaic base projects in desert, Gobi, and desert areas
Reading this article requires
2 Minute

On July 13, 2023, the installed capacity of new energy in Xinjiang reached 50.26 million kilowatts, exceeding 50 million kilowatts, accounting for 41% of the total installed capacity, playing a positive role in helping China achieve carbon peak and carbon neutrality.

In recent years, Xinjiang has relied on its regional advantages to continuously promote energy structure adjustment, vigorously develop renewable energy, and accelerate the construction of large-scale wind power and photovoltaic base projects in desert, Gobi, and desert areas.

In view of the large-scale access of new energy to Xinjiang power grid, the energy Big data center has pursued the new energy scene in Xinjiang day by day, realized the dynamic monitoring of new energy operation, continuously improved the accuracy of scenery prediction, and promoted the integration and consumption of new energy by digital means. Editor/Zhao E


Comment

Related articles

Wind power

Liaoning 2GW wind power project construction plan released!

02-21

Energy storage

Henan Gongyi Housihe pumped storage power station project signed

02-21

Battery

Added 7GWh! BYD Guangxi battery project starts construction

02-21

Wind power

Siemens Gamesa 21.5MW Ultra Large Wind Turbine Prototype Completed Installation in Denmark

02-21

Photovoltaic

Albania launches 235 MW solar project

02-21

Hydrogen energy

Germany launched the second auction of 2.5 billion euros of green hydrogen imports

02-21

Collect
Comment
Share

Retrieve password

Get verification code
Sure